Laserfiche WebLink
material or equipment of other Suppliers may be submitted to change in any of the Contract Documents (or in the <br /> ENGINEER for review under the circumstances described provisions of any other direct contract with OWNER <br /> below. for work on the Project) to adapt the design to the <br /> proposed substitute item and whether or not <br /> 1 . 'Or-Equal" Items: If in ENGINEER's sole discre- incorporation or use of the proposed substitute item <br /> tion an item of material or equipment proposed by CON- in connection with the Work is subject to payment of <br /> TRACTOR is functionally equal to that named and any license fee or royalty. All variations of the -pro- <br /> sufficiently similar so that no change in related Work will posed substitute item from that specified will be <br /> be required, it may be considered by ENGINEER as an identified in the application, and available <br /> "or-equal" item, in which case review and approval of engineering, sales, maintenance, repair, and <br /> the proposed item may, in ENGINEER's sole discretion, replacement services will be indicated. The <br /> be accomplished without compliance with some or all of application will also contain an itemized estimate of <br /> the requirements for approval of proposed substitute all costs or credits that will result directly or indirectly ` <br /> £ <br /> items. For the purposes of this paragraph 6.05.A. 1 , a from use of such substitute item, including costs of <br /> proposed item of material or equipment will be redesign and claims of other contractors affected by <br /> considered functionally equal to an item so named if: any resulting change, all of which will be considered <br /> by ENGINEER in evaluating the proposed substitute <br /> a. in the exercise of reasonable judgment item. ENGINEER may require CONTRACTOR to <br /> ENGINEER determines that: (i) it is at least equal furnish additional data about the proposed <br /> in quality, durability, appearance, strength, and substitute item. <br /> design characteristics; (ii) it will reliably perform at <br /> least equally well the function imposed by the B. Substitute Construction Methods or Procedures: If a <br /> design concept of the completed Project as a specific means, method, technique, sequence, or procedure <br /> of <br /> functioning whole, and; construction is shown or indicated in and expressly required by <br /> the Contract Documents, CONTRACTOR may furnish or utilize <br /> b. CONTRACTOR certifies that: (i) there is no a substitute means, method, technique, sequence, or procedure <br /> increase in cost to the OWNER; and (ii) it will of construction approved by ENGINEER. CONTRACTOR shall <br /> conform substantially, even with deviations, to the submit sufficient information to allow ENGINEER, in <br /> detailed requirements of the item named in the ENGINEER's sole discretion, to determine that the. substitute <br /> Contract Documents. proposed is equivalent to that expressly called for by the <br /> Contract Documents. The procedure for review by ENGINEER <br /> 2. Substitute Items will be similar to that provided in subparagraph 6.05A.2. <br /> a. If in ENGINEER's sole discretion an item of C. Engineer's Evaluation: ENGINEER will be allowed a <br /> material or equipment proposed by CONTRACTOR reasonable time within which to evaluate each proposal or <br /> does not qualify as an "or-equal' item under submittal made pursuant to paragraphs 6.05.A <br /> and 6.05. 6. <br /> paragraph 6.05A. 1 , it will be considered a proposed ENGINEER will be the sole judge of acceptability. No "or-equal" <br /> substitute item . or substitute will be ordered, installed or utilized until <br /> ENGINEER's review is complete, which will be evidenced by <br /> b. CONTRACTOR shall submit sufficient infor- either a Change Order for a substitute or an approved Shop <br /> mation as provided below to allow ENGINEER to Drawing for an "or equal." ENGINEER will advise <br /> determine that the item of material or equipment CONTRACTOR in writing of any negative determination. <br /> proposed is essentially equivalent to that named <br /> and an acceptable substitute therefore. Requests D. Special Guarantee: OWNER may require CON- <br /> for review of proposed substitute items of material TRACTOR to furnish at CONTRACTOR's expense a special <br /> or equipment will not be accepted by ENGINEER � performance guarantee or other surety with respect to any <br /> from anyone other than CONTRACTOR. substitute. <br /> c. The procedure for review by ENGINEER E. ENGINEER's Cost Reimbursement: ENGINEER will <br /> will be as set forth in paragraph 6.05A.2.d, as record time required by ENGINEER and ENGINEER's Consul- <br /> supplemented in the General Requirements and as tants in evaluating substitute proposed or submitted by <br /> ENGINEER may decide is appropriate under the CONTRACTOR pursuant to paragraphs 6.05.A.2 and 6.05. 6 - <br /> circumstances. and in making changes in the Contract Documents (or in the <br /> provisions of any other direct contract with OWNER for work on <br /> d. CONTRACTOR shall first make written the Project) occasioned thereby. Whether or not ENGINEER <br /> application to ENGINEER for review of a proposed approves a substitute item so proposed or submitted by CON- <br /> substitute item of material or equipment that TRACTOR, CONTRACTOR shall reimburse OWNER for the <br /> CONTRACTOR seeks to furnish or use. The charges of ENGINEER and ENGINEER's Consultants for <br /> application shall certify that the proposed substitute evaluating each such proposed substitute. <br /> Rem will perform adequately the functions and <br /> achieve the results called for by the general design, F. CONTRACTOR's Expense: CONTRACTOR shall <br /> be similar in substance to that specified, and be provide all data in support of any proposed <br /> substitute or <br /> suited to the same use as that specified. The appli- 'or-equal" at CONTRACTOR's expense. <br /> cation will state the extent, if any, to which the use <br /> of the proposed substitute item will prejudice 6.06 Concerning Subcontractors, Suppliers, and Others <br /> CONTRACTOR's achievement of Substantial <br /> Completion on time, whether or not use of the A. CONTRACTOR shall not employ any Subcontractor, <br /> proposed substitute item in the Work will require a Supplier, or other individual or entity (including those acceptable <br /> 6706-38392\8/20/03 00700- 16 VRB <br />