receipt of the certificates (or other evidence requested) required B. Except as oh
<br /> by paragraph 2.05. C. OWNER and CONTRACTOR shall each protection of persons orthe Work se gor�rproperty ed for the
<br /> the Site or
<br /> ' provide to the other such additional information in respect of adjacent thereto, and except as otherwise stated in the Contract
<br /> insurance provided as the other may reasonably request If Documents, all Work at the Site shall be performed
<br /> during
<br /> either party does not purchase or maintain all of the Bonds and
<br /> insurance required of such party by the Contract Documents, regular rtimew work orothe performance urs , and f Work
<br />CTOR won ill nSatr permit
<br /> such party shall notify the other party in writing of such failure to Sunday, or any legal holiday without OWNER's written consent
<br /> purchase prior to the start of the Work, or of such failure to
<br /> (which will not unreasonably withheld) given after prior
<br /> maintain prior to any change in the required coverage. Without written notice to ENGINEER.
<br /> prejudice to any other right or remedy, the other party may elect
<br /> to obtain equivalent Bonds or insurance to protect such other
<br /> ' party's interests at the expense of the party who was required to 6.03 Services, Materials, and Equipment
<br /> provide such coverage, and a Change Order shall be issued to
<br /> adjust the Contract Price accordingly. A. Unless otherwise specified in the General Re-
<br /> quirements, CONTRACTOR shall provide and assume full
<br /> ' 5. 10 Partial Utilization, Acknowledgment of Property responsibility for all services, materials, equipment, labor,
<br /> Insurer transportation, construction equipment and machinery, tools,
<br /> appliances, fuel, power, light, heat, telephone, water, sanitary
<br /> A. If OWNER finds it necessary to occupy or use a facilities, temporary facilities, and all other facilities
<br /> and
<br /> portion or portions of the Work prior to Substantial Completion incidentals necessary for the performance, testing , start-up, and
<br /> of all the Work as provided in paragraph 14.05, no such use or completion of the Work.
<br /> occupancy shall commence before the insurers providing the
<br /> property insurance pursuant to paragraph 5.06 have B. All materials and equipment incorporated into the
<br /> acknowledged notice thereof and in writing effected any Work shall be as specified or, if not specified,
<br /> shall be of good
<br /> changes in coverage necessitated thereby. The insurer; quality and new, except as otherwise provided in the
<br />Contract
<br /> providing the property insurance shall consent by endorsement Documents. All warranties and guarantees specifically called
<br /> on the policy or policies, but the property insurance shall not be for by the Specifications shall expressly run to the
<br /> benefit of
<br /> ' canceled or permitted to lapse on account of any such partial OWNER. If required by ENGINEER, CONTRACTOR shall
<br /> use or occupancy. fumish satisfactory evidence (including reports of required tests)
<br /> as to the source, kind, and quality of materials and equipment.
<br /> All materials and equipment shall be stored, applied, installed,
<br /> ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES connected, erected, protected, used, cleaned, and conditioned
<br /> in accordance with instructions of the applicable Supplier,
<br /> except as otherwise may be provided in the Contract Docu-
<br /> 6.01 Supervision and Superintendence ments.
<br /> ' A. CONTRACTOR shall supervise, inspect, and direct 6 . 04 Progress Schedule
<br /> the Work competently and efficiently, devoting such attention
<br /> thereto and applying such skills and expertise as may be A. CONTRACTOR shall adhere to the progress
<br /> necessary to perform the Work in accordance with the Contract schedule established in accordance with paragraph 2.07 as it
<br /> ' Documents. CONTRACTOR shall be solely responsible for the may be adjusted from time to time as provided below.
<br /> means, methods, techniques, sequences , and procedures of
<br /> construction, but CONTRACTOR shall not be responsible for 1 . CONTRACTOR shall submit to ENGINEER for
<br /> the negligence of OWNER or ENGINEER in the design or acceptance
<br /> specification of a spec means, method, techni ue s uence roposda u the extent indicated in paragraph that
<br /> technique, eq proposed adjustments in the progress schedule that will
<br /> or procedure of construction which is shown or indicated in and not result in changing the Contract Times (or
<br /> expressly required by the Contract Documents. CON- Milestones). Such adjustments will conform generally to
<br /> TRACTOR shall be responsible to see that the completed Work the progress schedule then in effect and additionally will
<br /> complies accurately with the Contract Documents. comply with any provisions of the General Re-
<br /> B. At all times duringthe quirements applicable thereto.
<br /> progress of the Work,
<br /> CONTRACTOR shall assign a competent resident superin- in the 2. ProP I osed adjustments
<br /> tendent thereto who shall not be replaced without written notice Progress schedule
<br /> to OWNER and ENGINEER except under extraordinarythat will change the Contract Times (or Milestones) shall
<br /> be submitted in accordance with the requirements of
<br /> circumstances. The superintendent will be CONTRACTOR's Article 12. Such adjustments may only be made by a
<br /> representative at the Site and shall have authority nh' to act on Change Osier or Written Amendment in accordance
<br /> ' behalf of CONTRACTOR. All communications given to or with Article 12.
<br /> received from the superintendent shall be binding on
<br /> CONTRACTOR. 6. 05 Substitutes and "Or-Equals"
<br /> ' 6.02 Labor, Working Hours A. Whenever an item of material or equipment is
<br /> spe
<br /> A. CONTRACTOR shall provide competent, suitably n mefiofa proprietary item or the name or described in the Contract fa
<br />particular Suppliements by using r,
<br /> qualified personnel to survey, lay out, and construct the Work the specification or description is intended to establish the
<br /> type,
<br /> as required by the Contract Documents. CONTRACTOR shall function, appearance, and quality required. Unless the
<br /> at all times maintain good discipline and order at the Site. specification or description contains or is followed by words
<br /> reading that no like, equivalent, or "or-equal" item or no
<br /> substitution is permitted, other items of material or equipment or
<br /> ' 6706-38392\8/20/03 00700- 15 VRB