Laserfiche WebLink
receipt of the certificates (or other evidence requested) required B. Except as oh <br /> by paragraph 2.05. C. OWNER and CONTRACTOR shall each protection of persons orthe Work se gor�rproperty ed for the <br /> the Site or <br /> ' provide to the other such additional information in respect of adjacent thereto, and except as otherwise stated in the Contract <br /> insurance provided as the other may reasonably request If Documents, all Work at the Site shall be performed <br /> during <br /> either party does not purchase or maintain all of the Bonds and <br /> insurance required of such party by the Contract Documents, regular rtimew work orothe performance urs , and f Work <br />CTOR won ill nSatr permit <br /> such party shall notify the other party in writing of such failure to Sunday, or any legal holiday without OWNER's written consent <br /> purchase prior to the start of the Work, or of such failure to <br /> (which will not unreasonably withheld) given after prior <br /> maintain prior to any change in the required coverage. Without written notice to ENGINEER. <br /> prejudice to any other right or remedy, the other party may elect <br /> to obtain equivalent Bonds or insurance to protect such other <br /> ' party's interests at the expense of the party who was required to 6.03 Services, Materials, and Equipment <br /> provide such coverage, and a Change Order shall be issued to <br /> adjust the Contract Price accordingly. A. Unless otherwise specified in the General Re- <br /> quirements, CONTRACTOR shall provide and assume full <br /> ' 5. 10 Partial Utilization, Acknowledgment of Property responsibility for all services, materials, equipment, labor, <br /> Insurer transportation, construction equipment and machinery, tools, <br /> appliances, fuel, power, light, heat, telephone, water, sanitary <br /> A. If OWNER finds it necessary to occupy or use a facilities, temporary facilities, and all other facilities <br /> and <br /> portion or portions of the Work prior to Substantial Completion incidentals necessary for the performance, testing , start-up, and <br /> of all the Work as provided in paragraph 14.05, no such use or completion of the Work. <br /> occupancy shall commence before the insurers providing the <br /> property insurance pursuant to paragraph 5.06 have B. All materials and equipment incorporated into the <br /> acknowledged notice thereof and in writing effected any Work shall be as specified or, if not specified, <br /> shall be of good <br /> changes in coverage necessitated thereby. The insurer; quality and new, except as otherwise provided in the <br />Contract <br /> providing the property insurance shall consent by endorsement Documents. All warranties and guarantees specifically called <br /> on the policy or policies, but the property insurance shall not be for by the Specifications shall expressly run to the <br /> benefit of <br /> ' canceled or permitted to lapse on account of any such partial OWNER. If required by ENGINEER, CONTRACTOR shall <br /> use or occupancy. fumish satisfactory evidence (including reports of required tests) <br /> as to the source, kind, and quality of materials and equipment. <br /> All materials and equipment shall be stored, applied, installed, <br /> ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES connected, erected, protected, used, cleaned, and conditioned <br /> in accordance with instructions of the applicable Supplier, <br /> except as otherwise may be provided in the Contract Docu- <br /> 6.01 Supervision and Superintendence ments. <br /> ' A. CONTRACTOR shall supervise, inspect, and direct 6 . 04 Progress Schedule <br /> the Work competently and efficiently, devoting such attention <br /> thereto and applying such skills and expertise as may be A. CONTRACTOR shall adhere to the progress <br /> necessary to perform the Work in accordance with the Contract schedule established in accordance with paragraph 2.07 as it <br /> ' Documents. CONTRACTOR shall be solely responsible for the may be adjusted from time to time as provided below. <br /> means, methods, techniques, sequences , and procedures of <br /> construction, but CONTRACTOR shall not be responsible for 1 . CONTRACTOR shall submit to ENGINEER for <br /> the negligence of OWNER or ENGINEER in the design or acceptance <br /> specification of a spec means, method, techni ue s uence roposda u the extent indicated in paragraph that <br /> technique, eq proposed adjustments in the progress schedule that will <br /> or procedure of construction which is shown or indicated in and not result in changing the Contract Times (or <br /> expressly required by the Contract Documents. CON- Milestones). Such adjustments will conform generally to <br /> TRACTOR shall be responsible to see that the completed Work the progress schedule then in effect and additionally will <br /> complies accurately with the Contract Documents. comply with any provisions of the General Re- <br /> B. At all times duringthe quirements applicable thereto. <br /> progress of the Work, <br /> CONTRACTOR shall assign a competent resident superin- in the 2. ProP I osed adjustments <br /> tendent thereto who shall not be replaced without written notice Progress schedule <br /> to OWNER and ENGINEER except under extraordinarythat will change the Contract Times (or Milestones) shall <br /> be submitted in accordance with the requirements of <br /> circumstances. The superintendent will be CONTRACTOR's Article 12. Such adjustments may only be made by a <br /> representative at the Site and shall have authority nh' to act on Change Osier or Written Amendment in accordance <br /> ' behalf of CONTRACTOR. All communications given to or with Article 12. <br /> received from the superintendent shall be binding on <br /> CONTRACTOR. 6. 05 Substitutes and "Or-Equals" <br /> ' 6.02 Labor, Working Hours A. Whenever an item of material or equipment is <br /> spe <br /> A. CONTRACTOR shall provide competent, suitably n mefiofa proprietary item or the name or described in the Contract fa <br />particular Suppliements by using r, <br /> qualified personnel to survey, lay out, and construct the Work the specification or description is intended to establish the <br /> type, <br /> as required by the Contract Documents. CONTRACTOR shall function, appearance, and quality required. Unless the <br /> at all times maintain good discipline and order at the Site. specification or description contains or is followed by words <br /> reading that no like, equivalent, or "or-equal" item or no <br /> substitution is permitted, other items of material or equipment or <br /> ' 6706-38392\8/20/03 00700- 15 VRB <br />