Laserfiche WebLink
any duty or authority to undertake responsibility thereof) prepared by or bearing the seal of ENGINEER or <br /> inconsistent with the provisions of the Contract ENGINEER's Consultant, including electronic media editions; <br /> Documents . and (ii) shall not reuse any of such Drawings, Specifications, <br /> other documents , or copies thereof on extensions of the Project <br /> 3. 03 Reporting and Resolving Discrepancies or any other project without written consent of OWNER and <br /> ENGINEER and specific written verification or adaption by <br /> A. Reporting Discrepancies ENGINEER. This prohibition will survive final payment, <br /> ' completion, and acceptance of the Work, or termination or <br /> 1 . If, during the performance of the Work, completion of the Contract Nothing herein shall preclude <br /> CONTRACTOR discovers any conflict, error, ambiguity, CONTRACTOR from retaining copies of the Contract <br /> or discrepancy within the Contract Documents or Documents for record purposes . <br /> ' between the Contract Documents and any provision of <br /> any Law or Regulation applicable to the performance of <br /> the Work or of any standard, specification , manual or ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND <br /> code, or of any instruction of any Supplier, CONTRAC- PHYSICAL CONDITIONS; REFERENCE POINTS <br /> ' TOR shall report it to ENGINEER in writing at once. <br /> CONTRACTOR shall not proceed with the Work <br /> affected thereby (except in an emergency as required 4.01 Availability of Lands <br /> by paragraph 6. 16.A) until an amendment or supple- <br /> ment to the Contract Documents has been issued by A. OWNER shall furnish the Site. OWNER shall notify <br /> one of the methods indicated in paragraph 3.04; provid- CONTRACTOR of any encumbrances or restrictions not of <br /> ed, however, that CONTRACTOR shall not be liable to general application but specifically related to use of the Site with <br /> OWNER or ENGINEER for failure to report any such which CONTRACTOR must comply in performing the Work. <br /> conflict, error, ambiguity, or discrepancy unless CON- OWNER will obtain in a timely manner and pay for easements <br /> TRACTOR knew or reasonably should have known for permanent structures or permanent changes in existing <br /> thereof. facilities. If CONTRACTOR and OWNER are unable to agree <br /> on entitlement to or on the amount or extent, if any, of any <br /> B. Resolving Discrepancies adjustment in the Contract Price or Contract Times, or both, as <br /> ' a result of any delay in OWNER's furnishing the Site, <br /> 1 . Except as may be otherwise specifically stated in CONTRACTOR may make a Claim therefore as provided in <br /> the Contract Documents, the provisions of the Contract paragraph 10.05. <br /> Documents shall take precedence in resolving any <br /> ' conflict, error, ambiguity, or discrepancy between the B. Upon reasonable written request, OWNER shall <br /> provisions of the Contract Documents and: furnish CONTRACTOR with a current statement of record legal <br /> title and legal description of the lands upon which the Work is to <br /> a. the provisions of any standard, specification, be performed and OWNER's interest therein as necessary for <br /> 1 manual, code, or instruction (whether or not specifi- giving notice of or filing a mechanic's or construction lien against <br /> cally incorporated by reference in the Contract such lands in accordance with applicable Laws and <br /> Regula- <br /> Documents); or tions . <br /> b. the provisions of any Laws or Regulations C. CONTRACTOR shall provide for all additional lands <br /> applicable to the performance of the Work (unless and access thereto that may be required for <br /> temporary <br /> such an interpretation of the provisions of the construction facilities or storage of materials and equipment. <br /> Contract Documents would result in violation of <br /> such Law or Regulation). 4.02 Subsurface and Physical Conditions <br /> 3. 04 Amending and Supplementing Contract Documents A. Reports and Drawings: The Supplementary <br /> ' A. The Contract Documents may be amended to provide Conditions identify: <br /> for additions, deletions, and revisions in the Work or to modify 1 .those reports of explorations and tests of <br /> the terms and conditions thereof in one or more of the following subsurface conditions at or contiguous to the Site that <br /> ways: (i) a Written Amendment; (ii) a Change Order, or (iii) a ENGINEER has used in preparing the Contract Docu- <br /> Work Change Directive. ments; and <br /> B. The requirements of the Contract Documents may be 2. those drawings of physical conditions in or relat- <br /> supplemented, and minor variations and deviations in the Work ing to existing surface or subsurface structures at or <br /> ' may be authorized, by one or more of the following ways: (i) a contiguous to the Site (except Underground Facilities) <br /> Field Order, (ii) ENGINEER's approval of a Shop Drawing or that ENGINEER has used in preparing the Contract <br /> Sample; or (iii) ENGINEER's written interpretation or darifi- Documents . <br /> cation. <br /> B. Limited Reliance by CONTRACTOR on Technical <br /> • 3.05 Reuse of Documents Data Authorized: CONTRACTOR may rely upon the general <br /> accuracy of the "technical data" contained in such reports and <br /> A. CONTRACTOR and any Subcontractor or Supplier or drawings , but such reports and drawings are not Contract Docu- <br /> ' other individual or entity performing or furnishing any of the ments. Such "technical data" is identified in <br />the Supplementary <br /> Work under a direct or indirect contract with OWNER: (i) shall Conditions. Except for such reliance on such "technical <br />data," <br /> not have or acquire any title to or ownership rights in any of the CONTRACTOR may not rely upon or make any Claim against <br /> Drawings, Specifications, or other documents (or copies of any <br /> ' 6706-38392\8/20/03 1 00700-9 VRB <br />