My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-014
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 2:08:03 PM
Creation date
10/1/2015 12:52:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
01/13/2009
Control Number
2009-014
Agenda Item Number
12.J.1
Entity Name
Wharton Smith Construction Group
Subject
West regional WWTF expansion to 6 MGD 1 Change Order No.2
Area
West Regional WWTF
Project Number
07-023
Supplemental fields
SmeadsoftID
7749
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wharton - Smith , Inc . <br /> CONSTRUCTION GROUP <br /> 111 <br /> December 23 , 2008 <br /> Raj Singh , P . E . <br /> PBS &J <br /> 482 South Keller Road <br /> Orlando , Florida 32810 <br /> Re : West Regional WWTF <br /> Vero Beach , FL <br /> Proposal # 14 — Reclaimed Water Pump System Modifications <br /> Dear Mr . Singh : <br /> Wharton-Smith , Inc proposes to construct the Reclaimed Water Pump System <br /> Modifications per the preliminary design report prepared by PBS&J , dated October 2008 . <br /> The proposal amount is $227 , 227 . 51 . <br /> This proposal is based on the following : <br /> 1 . The decision to install the replacement pumps at the Intermediate Pump <br /> Station ( IPS ) , next to the Operations Building at the plant site . <br /> 2 . We have included a new 12 " PVC Reclaimed Water Main from the <br /> Intermediate Pump Station to the existing reclaimed meter assembly on the <br /> far east side of the property ( approximately 800 LF ) . <br /> 3 . Demolition and removal of the existing pumps and piping on the IPS . <br /> 4 . No additional permits are required . <br /> 5 . The existing electrical gear has enough capacity to feed the new pump <br /> panels . <br /> 6 . The existing sink and hot water heater in the electrical room can be removed <br /> and relocated within the Operations Building . The new pump control panels <br /> need to be installed in that corner of the electrical room . <br /> 7 . The existing reclaimed water meter is functional and can be re- installed next <br /> to the IPS . Neither replacement or repair costs are included in this proposal . <br /> 8 . We have included allowances for the following items ( need additional <br /> information ) <br /> a . Painting $2500 <br /> b . SCADA changes $ 5000 <br /> c . Electrical to existing flowmeter $ 3500 <br /> 9 . Receiving a 45 day time extension to the contract. It is anticipated that the <br /> pump equipment ( specifically the pump motors ) will not be delivered before <br /> the original contract work is complete and therefore , we will not be able to <br /> complete this scope of work within the original contract dates <br /> 750 Monroe Road , Sanford , FL 32771 ♦ P . O . Box 471028 , Lake Monroe , Florida 32747- 1028 ♦ 407-321 -8410 <br />
The URL can be used to link to this page
Your browser does not support the video tag.