Laserfiche WebLink
k Wharton - Smith , Inc . <br /> CONSTRUCTION GROUP <br /> This proposal does not include : <br /> 1 . Any interface with the remote storage tank located at the north plant. We have <br /> included an allowance for SCADA changes so if the information required for that <br /> interface is available at the West plant, we will be able to complete the interface . <br /> 2 . Any motorized valves or control valves referred to in the Preliminary Design <br /> Report . <br /> 3 . Any structural modifications to the Intermediate Pump Station ( IPS ) , except for <br /> the construction of new pump bases . It is assumed that the existing structure <br /> and the existing holes in the top deck are capable of receiving the new pumps . <br /> 4 . Any work at the existing reclaimed pump station except for the items listed <br /> above . <br /> If you have any questions , please contact me . <br /> Sincerely , <br /> X <br /> ON- MITH , INC . <br /> hite , P . E . <br /> Sr. Project Manager <br /> 750 Monroe Road , Sanford , FL 32771 ♦ P .O . Box 471028 , Lake Monroe , Florida 32747- 1028 • 407-321 -8410 <br />