Laserfiche WebLink
Ms . Polly Kratman GeoSyntec Consultants <br /> Indian River County <br /> 7 June 2005 <br /> Page 9 <br /> GeoSyntec will work diligently to meet those milestones and the schedule developed for <br /> the Project . <br /> BUDGET ESTIMATE <br /> A budget estimate for the scope of work outlined in Tasks 1 through 3 of this <br /> proposal is summarized in the following table . A detailed budget estimate is provided <br /> as Attachment B . The budget estimate does not include permit fees that will be required <br /> at the time the Permit Application is submitted to FDEP . <br /> • Task 1 — General Consulting/Meeting Support/Project Management $205223 <br /> • Task 2 — Design and Permit Application $ 1285701 <br /> • Task 3 — ERP Modification $ 14,600 <br /> TOTAL $ 1639524 <br /> GeoSyntec will not exceed the budget estimate without prior approval and written <br /> authorization from IRC . <br /> ASSUMPTIONS <br /> GeoSyntec made the following general assumptions in preparing the project <br /> schedule and budget estimate presented in this proposal : <br /> • Electronic copies of the permit drawings for the proposed C &D expansion of <br /> Segment 1 and a recent topographic base map of the Class I landfill will be <br /> available, in AutoCAD format, for use in preparing the permit drawings for this <br /> Proj ect . <br /> • IRC will pay all permitting fees . <br /> • The proposed schedule and budget estimate presented in this proposal are based <br /> on GeoSyntec ' s understanding of the project requirements and experience with <br /> permitting similar facilities . They do not include any delays or concept changes <br /> that may be required by FDEP or IRC during the course of the Project. <br /> XL05065UL050010-final <br />