Laserfiche WebLink
Ms . Polly Kratman GeoSyntec Consultants <br /> Indian River County <br /> 7 June 2005 <br /> Page 8 <br /> GeoSyntec will provide four complete copies of the Permit Application to FDEP <br /> and two copies to SWDD . An electronic file of the Permit Application will also be <br /> provided to FDEP and SWDD . <br /> Response to Regulatory Comments <br /> Following submittal of the Permit Application, GeoSyntec will meet with FDEP to <br /> present and discuss the Class I landfill design for the vertical expansion . GeoSyntec <br /> will provide FDEP with written responses to requests for additional information (RAIs) <br /> throughout the course of the permit review process . For the purpose of the budget <br /> estimate, GeoSyntec has assumed one response to RAI will be required . <br /> Task 3 — ERP Modification <br /> Under this task, GeoSyntec will analyze the effect of adding the vertical expansion <br /> area on the stormwater management system as currently designed and presented in the <br /> ERP . A modification to the ERP will be prepared for submittal to FDEP to account for <br /> any increase in the amount or timing of stormwater runoff due to grading changes or <br /> infiltration differences from the expansion final cover system or other changes to the <br /> landfill drainage systems . As a part of this task, GeoSyntec will provide written <br /> responses to RAIs from FDEP on the ERP modification . For the purpose of the budget <br /> estimate, GeoSyntec has assumed that one response to RAI will be required . <br /> SCHEDULE <br /> GeoSyntec has prepared a schedule for preparing the Permit Application, which is <br /> included as Attachment A. The schedule, as presented, assumes a start date of 20 June <br /> 2005 , and projects a Permit Application submittal to FDEP on 14 October 2005 . <br /> GeoSyntec has assumed that the required permit will be obtained within three to six <br /> months of submission. Response to FDEP comments will be performed during this <br /> three- to six -month period . Therefore, it is anticipated that the permit for the vertical <br /> expansion will be issued by 14 April 2006 . <br /> GeoSyntec recognizes the importance of the schedule for SWDD and their need to <br /> obtain the required disposal capacity from the Class I landfill vertical expansion . <br /> GeoSyntec will work with SWDD to refine the project schedule and set the milestones <br /> necessary to meet the needs of the Project . Throughout the duration of the Project, <br /> XI05065UL050010-final <br />