My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-124
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2016 2:03:40 PM
Creation date
9/30/2015 8:37:02 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
04/05/2005
Control Number
2005-124
Agenda Item Number
11.I.1
Entity Name
GeoSyntec Consultants
Subject
Work Authorization No. 9902-09 Fleet Management Facility
Limited Petroleum Site Assessment
Area
4450 41st. St.
Supplemental fields
SmeadsoftID
4861
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOSYNTEC CONSULTANTS <br /> Janet B . Dunlap , P . E . <br /> 18 March 2005 <br /> Page 4 <br /> ASSUMPTIONS <br /> During the preparation of this proposal, GeoSyntec has made the following <br /> assumptions : <br /> • Access to sampling locations is not restricted to GeoSyntec . <br /> • All sampling can be performed in Level D personal protective equipment. <br /> • GeoSyntec will be able to work unimpeded between Monday and Friday from 7 <br /> am - 7 pm. <br /> • GeoSyntec and/or subcontractors will hand auger to a minimum depth of 5 ft BLS <br /> in an effort to located buried utilities prior to advancing borings . However, we <br /> assume that IRCFM will clear/mark utilities prior to GeoSyntec ' s arrival onsite <br /> and will "clear" each drilling location prior to GeoSyntec performing subsurface <br /> activities . Unmarked utilities that are damaged will not be GeoSyntec ' s <br /> responsibility. <br /> • GeoSyntec has assumed that liquids generated during the well development and <br /> sampling will be discharged directly onto the ground adjacent to the monitoring <br /> well (for percolation or evaporation) . <br /> • GeoSyntec has assumed that the DPT soil and groundwater investigation and well <br /> installations can be completed in one day. <br /> • GeoSyntec has assumed that top-of-casing elevations will not be surveyed by a <br /> professional licensed surveyor at this time . <br /> ESTIMATED COSTS <br /> GeoSyntec proposes to complete the proposed scope of work on a lump sum basis . <br /> The lump sum cost for the full scope of work (including SPLP analysis) and preparation <br /> of a letter report is $8,300 , the lump sum cost for completing the scope of work and <br /> letter report, but not performing SPLP analysis is $7,950 . Any tasks which IRCFM <br /> requests which are outside the defined scope of work will be completed in accordance <br /> with the hourly rate schedule negotiated with Indian River County . <br /> XR050023/XR05XXXX/IRC —Limited Petroleum Site Assessment <br />
The URL can be used to link to this page
Your browser does not support the video tag.