My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-066
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:19:29 PM
Creation date
9/30/2015 9:33:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
02/21/2006
Control Number
2006-066
Agenda Item Number
11.J.1.
Entity Name
The Danella Companies,Inc.
Subject
No. 2005-021-Reclaim water line replacement
Area
5th St. SW at Lateral J canal
Project Number
UCP 2757
Bid Number
7033
Supplemental fields
SmeadsoftID
5493
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br /> Indian River County Department of Ufilifies <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST <br /> Project IRC - 5th Street SW on Fast Side of Lateral J Canal - 6" Force Main Dir. Drill Under Cnlcert from 5th St. SW <br /> )escription: WIP #471-169000-02533 Misc. Sewer Sersice, UCP #2757 <br /> 24-Jan-06 <br /> LABOR COSTS MATERIAL COSTS <br /> Bid Bid Item E.a(ian Unit oI Labor Unit Total Labor <br /> Item No. Description Nfatend Unit Total Material <br /> uan fity Measure Price Price Price Price <br /> n Mobilization I 4% 439.40 <br /> 78 Demobilization 1 1 % 109.85 <br /> 79 Maintenance of Traffic I 1 % 109.55 <br /> o4b Install 8 " HDPE Flonz. Directional Drill 240 LF 522.00 5.280.00S16.99- <br /> 06 Install MRJDI Fittin s - 4,077.60 <br /> B L00 Tons 31 ,665 .00 1 ,665.00 S4,500 4,500.00 <br /> 31e Install 6" PVC Force Main 40 LF $6.00 240.00 <br /> 136 Tap 6" Main for Installation of Assembl 2 4.56 182'40 <br /> Y EA $600.00 1 ,200.00 <br /> na Install Wet Ta Assembly 6"X &D 2 EA 5900.00 1 ,800.00 <br /> 23 Potholes 1 ,044.39 2.088 .78 <br /> 4 EA . S200.00 800.00 <br /> Subtotal Subtotal Sewer System Labor 10,985 .00 <br /> Subtotal Subtotal Sewer System Labor, Mob., Demob. 11 ,644. 10 <br /> SubTotal Labor Cost $ 11 ,644. 10 SubTotal Mater. Cos[ $101848.78 <br /> TOTAL PROJECT COST $22492.88 <br /> Attachment A <br />
The URL can be used to link to this page
Your browser does not support the video tag.