Laserfiche WebLink
C <br /> Indian River County Department of Ufilifies <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST <br /> Project IRC - 5th Street SW on Fast Side of Lateral J Canal - 6" Force Main Dir. Drill Under Cnlcert from 5th St. SW <br /> )escription: WIP #471-169000-02533 Misc. Sewer Sersice, UCP #2757 <br /> 24-Jan-06 <br /> LABOR COSTS MATERIAL COSTS <br /> Bid Bid Item E.a(ian Unit oI Labor Unit Total Labor <br /> Item No. Description Nfatend Unit Total Material <br /> uan fity Measure Price Price Price Price <br /> n Mobilization I 4% 439.40 <br /> 78 Demobilization 1 1 % 109.85 <br /> 79 Maintenance of Traffic I 1 % 109.55 <br /> o4b Install 8 " HDPE Flonz. Directional Drill 240 LF 522.00 5.280.00S16.99- <br /> 06 Install MRJDI Fittin s - 4,077.60 <br /> B L00 Tons 31 ,665 .00 1 ,665.00 S4,500 4,500.00 <br /> 31e Install 6" PVC Force Main 40 LF $6.00 240.00 <br /> 136 Tap 6" Main for Installation of Assembl 2 4.56 182'40 <br /> Y EA $600.00 1 ,200.00 <br /> na Install Wet Ta Assembly 6"X &D 2 EA 5900.00 1 ,800.00 <br /> 23 Potholes 1 ,044.39 2.088 .78 <br /> 4 EA . S200.00 800.00 <br /> Subtotal Subtotal Sewer System Labor 10,985 .00 <br /> Subtotal Subtotal Sewer System Labor, Mob., Demob. 11 ,644. 10 <br /> SubTotal Labor Cost $ 11 ,644. 10 SubTotal Mater. Cos[ $101848.78 <br /> TOTAL PROJECT COST $22492.88 <br /> Attachment A <br />