My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-066
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-066
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:19:29 PM
Creation date
9/30/2015 9:33:12 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
02/21/2006
Control Number
2006-066
Agenda Item Number
11.J.1.
Entity Name
The Danella Companies,Inc.
Subject
No. 2005-021-Reclaim water line replacement
Area
5th St. SW at Lateral J canal
Project Number
UCP 2757
Bid Number
7033
Supplemental fields
SmeadsoftID
5493
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br /> No. 2005-021 — 51h Street SW on East Side of Lateral J Canal 6" Force Main Under Culvert <br /> DATE OF ISSUANCE: February, 2006 EFFECTIVE DATE : February, 2006 <br /> OWNER: Indian River County <br /> CONTRACTOR: The Danella Companies, Inc . <br /> CONTRACT : WATER SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br /> AND MISCELLANEOUS LABOR CONTRACT BID NO . 7033 Awarded 03 / 15/05 <br /> PROJECT 5 °i Street SW at Lateral J Canal 6" Dir. Drill under Culver from east side <br /> COUNTY UTILITY PROJECT NO . : UCP #2757 CONTRACTOR' S PROJECT NO. : N/A <br /> COUNTY WIP No . 471 - 169000-02533 Misc . Sewer Service <br /> You are directed to proceed promptly with the following work: <br /> Description: <br /> Please install about 240 LF of 8" HDPE Directional Drill force main and about 40 LF of 6" PVC force main as <br /> necessary adjacent to existing 6" PVC force main along Lateral J Canal under an existing 36" CMP Culvert that will <br /> be replaced with a 54" CMP Culvert. The depth of the culvert is about 18 feet from the surface and the Lateral Canal <br /> is about 20 feet deep. The directional drill should be about 30 feet deep under the culvert to allow for rising when <br /> pulled so that it will be about 5 feet under the existing culvert, per the 1RFWCD . <br /> Purpose of Work Change Directive: <br /> To allow replacement of 36" CMP Culvert <br /> Method of determining Contract Price: <br /> O Unit Prices: Bid Items as established pursuant to Bid No. 7033 , and awarded by the Board of County <br /> Commissioners on March 15 , 2005 to The Danella Companies, Inc. <br /> ❑ Lump Sum <br /> ❑ Cost of the Work <br /> The Cost of Labor, Contin g enc and Contract Time is summarized below: " y I <br /> Estimated Labor Cost = $ 11 ,644. 10 Estimated Contract Time: 30da s €` Q'4; ' <br /> Total Estimated Labor Co <br /> $ 11 <br /> 1 ] ,644. 10 <br /> ti 9 �' P n "la• <br /> q y <br /> REC MEN D: APPROV);D '�' '\kr <br /> ACCEPTED: <br /> B B : <br /> By: Chair, an c Board No �Cou y Vt <br /> The Darrell Companies, Inc. Gordon Spark . E. ` �xr <br /> Environ mal E ineer Con ssiollot <br /> _ ' S <br /> Date: 11'VuYQ= ;'•` _ <br /> Date : li !f 6 Date: 02 - 21':'- 06to, o <br /> Attachment 6 <br /> F:AUtilitiesVU'rlLl i Y - ENGINEERINGAProjects - Utility Construction PeirriesVlRC - 5th St. SW - Lateral .1 8-inch FM Dir. Drill UNder Culver <br /> at UCP#2757AA - Work Authorization No. 2005-021 - Attachment ❑ .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.