Laserfiche WebLink
Indian River Countv Department of Utilities <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST Attachment 1 <br /> Pro'ect: CR 512 Phase III Roadwav Im riwements <br /> Description: Utility Relocations <br /> 29-Jun-06 LABORCOS'TS MATERIAL COSTS <br /> Bid Bid Item Estimated Unit of Labor UmIF Total Labor Material Unit Total Material <br /> Item No. Description Quantity Measure Price Price Price Price <br /> 77 Mobilization I 4% $7,611 . 13 <br /> 78 Demobilization 1 1 % $1 ,902.78 <br /> 79 Maintenance of Traffic I 1 '7 $ 1 ,902 .78 <br /> Bid Item J-5 - Sewer Pipe 10" HDPE (Directional Bore) 1 ,050 LF <br /> 04d Install 10" HDPE Horizontal Directional Drill 1 ,0500 LF $28.00 $29,400.00 24.42 25.641 .00 <br /> 06 Install Mechanical Restrained Joint Fittings 0.50 TON $ 1 ,665.00 5832.50 3,500-00 1 ,750.00 <br /> 7b Install Mechanical Restraint Joint on Existing 10'-12" Main 4.0 EA $500.001 52,000.00 55.00 220-00 <br /> 09 Make Connection to Existing Main 20 EA $795.00 $ 1 ,590.00 1 ,500.00 3,000.00 <br /> 19e Install 10" NRS Plug Valve & Box 2 EA $635.00 $ 1 ,270.00 1 ,695 .00 3,390-00 <br /> 23 'rest Holcs/Potholes 10 EA $200.00 $2,000.00 0.00 <br /> 496 Install 2" Air Release Valve with ARV Manhole & Stmctum 2 EA $400.00 $800.00 1 ,950.00 3,900.00 <br /> Bid Item J-10 Sanitary Sewer Adjustment Assy 8" DIP (include <br /> (4) 45 Bend) 2 EA <br /> 05c Install 8" HDPE by Open Cut 40.0 LF 585.00 53,400.00 14.99 599.60 <br /> 06 Install Mechanical Restrained Joint Fittings 0.80 TON $1 ,665 .00 $ 1 ,332.00 3,500.00 2,800.00 <br /> 07a Install Mechanical Restrained Joints on Existing 3"- 8" Main 4 EA $333 .00 $1 ,332 .00 36.11 144 .44 <br /> 09 Make Connection to Existing Main 4.0 EA $795 .00 $3, 180.00 1 ,500.00 6,00000 <br /> 23 Test Holes'Potholes 4 EA $200.00 $800.00 0.00 <br /> Bid Item J-1l Sanitary Server Adjustment Assy 10" DIP <br /> (include (4) 45 Bend) 1 EA <br /> 05d Install 10" HOPE by Open Cut 26.0 LF 590.00 $2,340,00 24.42 634.92 <br /> O6 Install Mechanical Restrained Joint Fittings 0.50 TON $ 1 ,665.00 $832.50 3,500.00 1 ,750.00 <br /> 7b Install Mechanical Restraint Joint on Existing 10'-12" Main 2.0 EA $500.00 $ 1 ,000.00 55 .00 110.00 <br /> 09 Make Connection to Existing Main 2.0 EA $795 .00 $1 ,590.00 1 ,500,00 3,000.00 <br /> 23 ''est Holes/Potholes 2 EA $200.00 $400.00 0.00 <br /> Bid Item J-12 Sanitary Sewer Adjustment Assy 12" DIP <br /> (include (4) 45 Bend) 3 EA <br /> OSe Install 12" Ii DPG by Open Cut78.0 LF $95.00 57,410.00 32 .90 2 ,56620 <br /> 06 Install Mechanical Restrained Joint Fittings 1 .95 FoN $1 ,665.00 $3,246.75 3,500.00 6,825 .00 <br /> 7b Install Mechanical Restraint Joint on Existing 10'-12" Main 6.0 EA 1 $500.00 $3,000.00 55 .00 330.00 <br /> 09 Make Connection to Existing Main 6-0 EA $795 .00 $4,770.00 1 ,50000 9,000.00 <br /> 23 'rest Holes/Potholes 6 EA 52W001 $ 1 ,200.00 0.00 <br />