Laserfiche WebLink
Indian Rirer Counts, Department of Utilities <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST Attachment 1 <br /> Project CR 512 Phase III Roadma Imurmrments <br /> Uescri nion: Utility Relocations <br /> 29-Jun-06 LABOR COSTS MATERIAL COSTS <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material <br /> Item No. Description Quantity Measure Price Price Price Price <br /> Bid Item U-20 - Potable Water Main 12" HDPE (Directional 1 ,150 LF <br /> 04e Install 12 " HDPE Horizontal Directional Drill 1 , 150.0 LF $32.00 $36,800.00 32 .90 37,835 .00 <br /> 06 Install Mechanical Restrained Joint Fittings 0.65 TON $ 1 ,665 .00 $ 1 ,082.25 3,500.00 2,275 .00 <br /> 7b Install Mechanical Restraint Joint on Existing 10'- 12" Main 4.0 EA 5500.00 $2,000.00 55.00 220.00 <br /> 09 Make Connection to Existing Main 2.0 EA $795 .00 $ 1 ,590.00 1 ,500.00 3,000.00 <br /> 10 Install Temporary Water Main Jumper 1 EA $460.00 $460.00 470.00 470.00 <br /> 17f Install 12" NRS Gate Valve & Box 2 EA $545.00 $ 1 ,090.00 1 ,764.00 3528.00 <br /> 216 Insta112 " Air Release Valve with ARV Manhole & Structure 2 EA $560.00 $ 1 , 120.00 1 ,740.00 3 ,480.00 <br /> 23 Test Holes/Potholes 10 EA $200.00 $2,000.00 0.00 <br /> 25b Install Permanent Blokv-off 1 EA $700.00 5700.00 470.00 470.00 <br /> 28 Install Sample Point 2 EA $85 .00 $ 170.00 75.00 150.00 <br /> Bid Item U-25 Potable Water Main Adjustment Assembly 6" <br /> DIP (include (4) 45 Bend) I EA <br /> O5b Install 6" Ii DPG by Open Cut 20.0 LF 580.00 $ 1 ,600.00 12.75 255 .00 <br /> 06 Install Mechanical Restraincd Joint Fittings 0.25 TON $ 1 ,665,001 5416.25 3,500.00 875 .00 <br /> 07a Install Mechanical Restrained Joints on Existing 3 "- 8" Main 2 EA $333 .00 5666.00 36.1-1 72 .22 <br /> 09 Make Connection to Existing Main 2.0 EA $795 .00 $1 ,590.00 1 ,500.00 3 ,000.00 <br /> 23 Test Holes/Potholes 2 EA 5200.00 $400.00 0.00 <br /> Bid Item U-26 Potable Water Main Adjustment Assembly 12" <br /> DIP (include (4) 45 Bend) 4 EA <br /> 05e Install 12" HDPE by Open Cut 104.0 LF $95.00 59,880.00 32 .90 3,421 .60 <br /> 06 Install Mechanical Restrained Joint Fittings 2.60 'ION $ 1 ,665.00 54,329.00 3,500,00 9, 100.00 <br /> !7bInstall Mechanical Restraint Joint on Existing 10'-12" Main 8.0 EA $500.00 $4,000.00 55.00 44000 Make Connection toExisting <br />Main 80 EA 5795.00 $6,360.00 1 ,500.00 1200000 Tcsl Holes/Potholes 8 EA5200.00 $ 1 ,600.00 0.00 <br /> Bid ItDIP (include (4) 45 Bend) I EA <br /> Install I6" 1-IDPE by Open Cut 26.0 IT $ 10000 52,60000 57 .94 1 ,506.44 <br /> Install Mechanical Restrained Joint Fittings 1 .06 TON $ 1 ,665.00 57 ,764.90 3,500.00 3,710.00 <br /> 7c Install Mechanical Restraint Joint on Existing 16" Main 2.0 EA 5550.00 $ 1 , 100.00 55.00 110.00 <br /> 09 Make Connection to Existing Main 2.0 BA 5795.00 $1 ,590.001 ,500.00 3,000.00 <br /> 23 Test Holes/Potholes 2 GA $200.00 $400.00 0.00 <br /> Bid Item U-2R Potable Water Main Adj nshnenl Assembly 20" <br /> DIP (include (4) 45 Bend) 2 EA <br /> 05g Install 20" HDPE by Open Cut 60.0 IF 5105 .00 $6,300.00 79.25 4,755 .00 <br /> O6 Install Mechanical Restrained Joint Fittings L60 TON 51 ,665 .00 $2,664.00 3500.00 5 ,600,00 <br /> 7d Install Mechanical Restraint Joint on Existing 20" Main 4.0 EA 5600,00 $2,400.00 55.00 220-00 <br /> 09 Make Connection to Existing Main4.0 EA $795.00 $3, 180.00 1 ,500.001 6,000.00 <br /> 23 Test Holes/Potholes 4 GA $200,001 $800.00 0-00 <br />