Laserfiche WebLink
ATTACHMENT 1 <br /> Task B <br /> 8th Street and King ' s Highway (58th Avenue) <br /> In- Line Wastewater Master Pump Station <br /> Proiect Description and Understanding <br /> Construction of a new in-line master wastewater pump station at the intersection of 8 "' Str et and 58th <br /> Avenue is necessary to direct wastewater flow to the West Regional WWTP. This pump kation will <br /> relieve some capacity from the South Regional WWTP and redirect flows from the South Regional <br /> WWTP to the West Regional WWTP which will undergo future expansion . <br /> The project will include construction of a new facility similar to the 64`h Avenue and CR 5 10 pump <br /> station currently under design . The facility will include a building constructed of concrete (CBS ) which <br /> will house the pumps , electrical and instrumentation gear, and generator. It is anticipated hat the station <br /> will be located on the Northwest corner of 8 `hStreet and 58th Avenue . <br /> Normal anticipated flows for the pump station are expected to range from 500 gpm to 320 gpm, which <br /> represent diversion of flows from the South Regional WWTP and buildout conditions per he 2004 <br /> Master Plan prepared by PBSJ . The design of the station will consider the use of VFD ' s t account for <br /> the wide range of flows and/or an allowance for a multiple pumps . Modeling scenarios , u ing IRCU' s <br /> existing sewer system hydraulic model will be evaluated to identify the ideal recommended option . <br /> The station should also include backup auxiliary power using diesel driven generator with an automatic <br /> transfer switch . Radio telemetry will be included for remote monitoring and control and match IRCU' s <br /> standard . It is assumed that Data Flow system will be specified . <br /> SCOPE OF SERVICES <br /> Consultant will provide survey of the site and utility information surrounding the intersect on for the <br /> construction of new forcemain and pump station . Consultant will prepare project drawings and <br /> specifications for the project which can be advertised for bidding by general contractors . Consultant will <br /> prepare and submit the appropriate permits listed herein for the construction of the project Consultant <br /> will provide construction phase services during construction , witnessing startup and operational testing , <br /> and provide final certification of the facility . The scope includes the following : <br /> Task 1 — Survey <br /> K14A will provide survey of one site for the facility, assumed to be the Northwest cornerd 8"' Street <br /> and King ' s Highway ( 58th Street) where the master pump station will be located and for th influent and <br /> effluent piping . The site survey will include a boundary survey for easement transfer with; the property <br /> owner, which will also include at least a 1009x100 ' area, topo, and other above ground in rmation . It is <br /> anticipated that the site granted to Utilities will be approximately 509x50 ' , not including access to site . <br /> For the influent/effluent forcemain piping, survey of the intersection will be provided up to 100 ' in either <br /> direction , including , edge of pavement, existing utilities , and benchmark. Right of way information will <br /> be included in the survey . It is assumed that Utilities will provide locates of their existing lines at the <br /> intersection . <br /> Task 2 = Design <br /> H :\General\Miller\Indian River County\Proposals\Task B - 8th Street In- line Master Pump Station Proposal-revl . doc <br />