My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-173
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 11:47:33 AM
Creation date
9/30/2015 8:47:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/17/2005
Control Number
2005-173
Agenda Item Number
11.J.1
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Master Planned Regional Lift Station Work Order No.7
Area
8th St. intersection of 58th Ave.
Supplemental fields
SmeadsoftID
4951
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The design will include hydraulic evaluation to clearly define conditions of service throu h buildout <br /> conditions , pump station design , pipe sizing , preparation of drawings and specifications for a master <br /> pump station , plan and profile of influent and effluent pipes to the pump station , and elect ical and <br /> controls design . <br /> Consultant will utilize the existing sewer system master plan hydraulic model prepared by PBSJ to <br /> establish future flows and hydraulics of the sewer system and determine present and future configuration <br /> and operation of the pump station for pump size selection . <br /> Construction drawings will be prepared which will include site plan , building plans and el vations , <br /> plan/profile of the forcemains from and to connections near the intersection of 8th Street and King ' s <br /> Highway ( 58th Avenue) , details , electrical schematics and process instrumentation and panel drawings for <br /> the pump station . It is assumed that approximately 20 to 22 drawings will be prepared . Consultant will <br /> provide copies of technical specifications , full size ( 2406) and half size ( I Ixl7) drawing forbidding <br /> and construction . All plans and technical specifications will be provided to the Owner in llectronic <br /> format (AutoCAD 2000 / MS Word , respectively) at the end of the project. The technical specifications <br /> and standard details will be based on the Owners current Utility Standards . <br /> We will coordinate with FPL regarding power requirements and improvements necessary for electrical <br /> service to the new station . It is assumed that 3 phase 480 volt power will be necessary . <br /> Electrical design will include main electrical service and coordination with FPL, pump starter and control <br /> panel, telemetry , control panel with PLC ' s , lighting , VFD design , and preparation of drawings and <br /> specifications for bidding . <br /> The design of a CBS structure to house the pumps , piping, generator, electrical , and controls will be <br /> included . The approximate size will be 500 sq ft footprint with architectural treatments , aid include an <br /> access road off of 8th Street or Kings Highway . <br /> SCADA system programming will be included under the contractor ' s scope of work. <br /> Task 3 — Permitting <br /> Consultant will prepare and submit a FDEP permit application 62-604 . 3000( 8 )(x) for the collection <br /> system modifications . The permit application fee of $500 will be included under this scorle and paid by <br /> Consultant . Consultant will submit the permit application when the drawings and specifications are <br /> complete . Consultant will respond to one request for additional information (RFI ' s ) from FDEP. <br /> Due to work which will be performed within Kings Highway right of way , we will prepar and coordinate <br /> IRC R/W review permit and respond to questions regarding same . It is assumed that any Fees associated <br /> with this permit will be waived and/or handled through interoffice coordination . <br /> An application and review of this pump station by the Community Development Department (CDD) is <br /> required for these construction activities . This approval is necessary for a contractor to apply for a <br /> building permit. KHA will undertake the task of pursuing a minor site modification for the pump station <br /> building through the CDD on behalf of the Indian River County Utilities Department. Thi $ minor site <br /> modification will include storm water drainage design and calculations to be submitted to the St. Johns <br /> Water Management District in the likely event that any storm water elements are altered aid/or the <br /> impervious area on the site is increased by 4 ,000 ft2 or more . <br /> Task 4 —Construction Phase Services <br /> Consultant will provide construction phase services for this project , including bidding and contract <br /> administration, shop drawing review , coordination and meeting attendance , construction observation , <br /> start-up services , preparation of record drawings , including electronic format in AutoCadd 2000 version <br /> H:\General\Miller\Indian River County\Proposals\Task B - 8th Street hi-line Master Pump Station Proposal-revl .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.