My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-173
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-173
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2016 11:47:33 AM
Creation date
9/30/2015 8:47:28 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/17/2005
Control Number
2005-173
Agenda Item Number
11.J.1
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Master Planned Regional Lift Station Work Order No.7
Area
8th St. intersection of 58th Ave.
Supplemental fields
SmeadsoftID
4951
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
View images
View plain text
in real world coordinates on CD , mylars , and final certification of completion of the project . It is <br /> anticipated that the duration of construction phase (notice to proceed to final completion) vill be six ( 6) to <br /> ( 8) months and that on-site construction observations will be as appropriate with the level of construction <br /> activity . <br /> Consultant will answer contractor questions and prepare addendums , as needed which will be distributed <br /> to all the contract document holders . Consultant will attend a pre-bid meeting at the project site or main <br /> office . Consultant will sell project manuals from our office , including drawings , specifications , and <br /> generation of all addendums . <br /> Shop drawing submittals will be reviewed for conformance with the contract documents . Shop drawings <br /> will be submitted directly to Engineer. Consultant will review the submittals and return copies to the <br /> contractor and Indian River County Utilities . <br /> Consultant will provide coordination of project status meetings and observation of constr ction for the <br /> duration of the project . Consultant will also review pay requests and provide recommend a ions for <br /> payment to Indian River County Utilities for the progress of the work. <br /> Construction observation will be provided by a field inspector. Total observation time will be <br /> approximately 120 hours . The field inspector will observe construction in order to determine if the <br /> project is being constructed in accordance with the contract documents . This will include witnessing <br /> installation of piping, pressure testing of new piping , construction of new CBS building , site work, <br /> mechanical equipment, electrical and controls , etc . Work that Consultant believes does not comply with <br /> the contract documents will be brought to the attention of Indian River County Utilities and the <br /> contractor. <br /> Start-up of the new pumps will be facilitated by the pump manufacture ' s representative and by the <br /> Contractor. Consultant will observe start-up of the new pumps once the installation is completed . <br /> Consultant will prepare record drawings of the facility and forcemain using information p ovided by the <br /> contractor. These record drawings will be used for final clearance of the facility , and incorporation into <br /> the Owner ' s GIS . A complete set of Mylar reproducible drawings , an electronic copy in AutoCAD <br /> format on a CD-ROM, and two sets of prints will be delivered to Indian River County Utilities upon <br /> completion of this project. <br /> A request for final release of the modifications will be submitted to FDEP, including certification <br /> application, record drawings , etc . <br /> A punch-list will be prepared for the items that need to be completed for final closeout of I he project. <br /> Consultant will provide two site visits with the contractor to review the status of the completion of these <br /> punch-list items . <br /> SCHEDULE: <br /> Tasks 1 and 2 are anticipated to be completed within 10 — 14 weeks from notice to proceed . Task 3 is <br /> anticipated to be completed within 4 weeks . Construction phase services is anticipated to take <br /> approximately six (6) to eight ( 8) months after the design and permitting is complete, dep0ding on <br /> duration of bidding, permitting, and actual construction . <br /> I <br /> INFORMATION PROVIDED BY OWNER : <br /> The Owner shall provide the record drawings of water and sewer utilities near 8 "' street an I Kings <br /> Highwary and historical data and projections of the system. <br /> FEES : <br /> H:\General\Miller\Indian River County\Proposals\Task B - 8th Street In-line Master Pump Station Proposal-revl . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).