in real world coordinates on CD , mylars , and final certification of completion of the project . It is <br /> anticipated that the duration of construction phase (notice to proceed to final completion) vill be six ( 6) to <br /> ( 8) months and that on-site construction observations will be as appropriate with the level of construction <br /> activity . <br /> Consultant will answer contractor questions and prepare addendums , as needed which will be distributed <br /> to all the contract document holders . Consultant will attend a pre-bid meeting at the project site or main <br /> office . Consultant will sell project manuals from our office , including drawings , specifications , and <br /> generation of all addendums . <br /> Shop drawing submittals will be reviewed for conformance with the contract documents . Shop drawings <br /> will be submitted directly to Engineer. Consultant will review the submittals and return copies to the <br /> contractor and Indian River County Utilities . <br /> Consultant will provide coordination of project status meetings and observation of constr ction for the <br /> duration of the project . Consultant will also review pay requests and provide recommend a ions for <br /> payment to Indian River County Utilities for the progress of the work. <br /> Construction observation will be provided by a field inspector. Total observation time will be <br /> approximately 120 hours . The field inspector will observe construction in order to determine if the <br /> project is being constructed in accordance with the contract documents . This will include witnessing <br /> installation of piping, pressure testing of new piping , construction of new CBS building , site work, <br /> mechanical equipment, electrical and controls , etc . Work that Consultant believes does not comply with <br /> the contract documents will be brought to the attention of Indian River County Utilities and the <br /> contractor. <br /> Start-up of the new pumps will be facilitated by the pump manufacture ' s representative and by the <br /> Contractor. Consultant will observe start-up of the new pumps once the installation is completed . <br /> Consultant will prepare record drawings of the facility and forcemain using information p ovided by the <br /> contractor. These record drawings will be used for final clearance of the facility , and incorporation into <br /> the Owner ' s GIS . A complete set of Mylar reproducible drawings , an electronic copy in AutoCAD <br /> format on a CD-ROM, and two sets of prints will be delivered to Indian River County Utilities upon <br /> completion of this project. <br /> A request for final release of the modifications will be submitted to FDEP, including certification <br /> application, record drawings , etc . <br /> A punch-list will be prepared for the items that need to be completed for final closeout of I he project. <br /> Consultant will provide two site visits with the contractor to review the status of the completion of these <br /> punch-list items . <br /> SCHEDULE: <br /> Tasks 1 and 2 are anticipated to be completed within 10 — 14 weeks from notice to proceed . Task 3 is <br /> anticipated to be completed within 4 weeks . Construction phase services is anticipated to take <br /> approximately six (6) to eight ( 8) months after the design and permitting is complete, dep0ding on <br /> duration of bidding, permitting, and actual construction . <br /> I <br /> INFORMATION PROVIDED BY OWNER : <br /> The Owner shall provide the record drawings of water and sewer utilities near 8 "' street an I Kings <br /> Highwary and historical data and projections of the system. <br /> FEES : <br /> H:\General\Miller\Indian River County\Proposals\Task B - 8th Street In-line Master Pump Station Proposal-revl . doc <br />