Laserfiche WebLink
Ms . Polly Kratman <br /> 17 January 2007 <br /> Page 8 <br /> Geosyntec will provide independent geotechnical QA/QC laboratory testing related to the <br /> construction. Experienced laboratory technicians will perform the required soils conformance <br /> tests in accordance with the test methods described in the Technical Specifications . The test <br /> results will be reviewed by the CQA Site Manager. SWDD will be provided with regular <br /> updates of the conformance testing activities and results . Summary reports of the laboratory <br /> conformance test results will be presented in the certification report. <br /> Subphase 5 .2 — Construction Management <br /> Under this subtask, Geosyntec will provide construction management services throughout the <br /> duration of construction . Construction management activities will include conducting a pre- <br /> construction meeting with the contractor (WM), preparing a detailed construction schedule using <br /> critical path method (CPM) of scheduling for evaluating construction progress, assisting the <br /> contractor in identifying critical construction tasks and material procurement activities, providing <br /> assistance to the contractor in formulating plans to regain the project schedule in case of <br /> unforeseen delays, and verifying quantities and conformance with the plans and specifications . <br /> Subphase 5 . 3 — Resident Engineering <br /> Under this subtask, Geosyntec will provide resident engineering support services throughout the <br /> duration of construction. Resident engineering support services will include Construction <br /> Drawings and Technical Specifications interpretation or clarification, an evaluation of any <br /> changed conditions, and engineering analyses for any design changes or improvisations . <br /> Geosyntec will also provide support to SWDD in the preparation of modifications, deletions, or <br /> additions to the contract documents . Contractor change proposals will be evaluated for technical <br /> merit, conformance with design intent, and reasonableness with respect to pricing. Geosyntec <br /> will also assist SWDD in the review and approval process for submittals required by the contract <br /> documents . Resident engineering support services are expected to include engineers, <br /> administrative assistants, CADD operators, and word processors, as needed. <br /> As part of the Resident Engineering task, Geosyntec will prepare a final CQA closure <br /> certification report. The closure certification reports will include as-built record drawings for the <br /> Project. The report will contain a narrative describing, in detail , the aspects of field activities <br /> associated with the closure system construction, specifically with reference to the activities <br /> identified in this proposal . The report will also include a summary of all conformance and <br /> performance tests conducted, testing frequencies, and test results showing compliance with the <br /> Technical Specifications and the CQA plan . The documentation of construction activities <br /> (presented on daily summary reports, monitoring logs, test data sheets, nonconformance <br /> identification and corrective measures reports, and design change records) will be included as <br /> XL06230i01 - 17-2007 JL70002_doc <br /> 8 ❑ � ilEl' C C � � SCtt'. RLJS CS � ICI IIOVEiLUCS <br />