Laserfiche WebLink
Ms. Polly Kratman <br /> 17 January 2007 <br /> Page 9 <br /> appendices to the final report. The as-built record drawings will be prepared for the Project, in <br /> CADD format, in order to illustrate the details of construction, any approved design changes, and <br /> other relevant information. <br /> The final CQA certification report and as-built record drawings will be signed and sealed by a <br /> registered professional engineer in the State of Florida . Geosyntec will prepare the report within <br /> 30 days of completing the construction activities. Five copies of the final CQA certification <br /> report will be submitted to FDEP for approval on behalf of SWDD . An electronic copy of as- <br /> built drawings in AutoCAD 2000 format will also be submitted to SWDD . <br /> Task 3 : GCCS Plan <br /> Phase 1 : GCCS Design Plan <br /> Geosyntec understands that as-built documentation, including as-built drawings and gas well <br /> construction logs, has been compiled by the SWDD for the existing gas system . Geosyntec <br /> understands that the as-built drawing will be available as a computer-aided drafting and design <br /> drawing that is readily useable without extensive editing. Based on this information, Geosyntec <br /> will develop a GCCS Design Plan reflective of the landfill ' s final build-out condition to an <br /> elevation of 185 ft NGVD . This will include tying in the existing GCCS with the future landfill <br /> gas collection system to the extent practicable. The GCCS will be designed so as to minimize <br /> existing gas well abandonment, which may include extending existing vertical gas wells or <br /> constructing remote wellheads that connect to existing gas wells . <br /> Development of the GCCS Design Plan will be based on projected waste filling rates and waste <br /> stream properties. Landfill gas generation over the life of the existing Class I landfill will be <br /> estimated using the United States Environmental Protection Agency' s Landfill Gas Emissions <br /> Model Version 3 . 02 (AP-42). Projections of gas generation are best made using site- specific <br /> design parameters such as methane generation rate (k) and potential methane generation capacity <br /> (Lo) . Geosyntec will meet with SWDD to identify site- specific design parameters. In the event <br /> that site- specific information is not available, Geosyntec will use the default parameters defined <br /> in AP -42. The GCCS design plan will include a title sheet, an existing conditions drawing, two <br /> design site plan drawings, a well construction information sheet, three detail sheets , and a surface <br /> emission monitoring route site plan. The drawings will include the calculated radius of influence <br /> of each well , map header line location and size, lateral pipe network and size, and condensate <br /> management system locations . It is assumed that the current number, capacity, and location of <br /> flares are sufficient. It is anticipated that the final design conditions will consist solely of vertical <br /> extraction wells . <br /> XL06230i01 - 17-2007 JL70002doc <br /> en ;�ineer � I scientists I innu�°uturs <br />