Laserfiche WebLink
Ms . Polly Kratman <br /> 17 January 2007 <br /> Page 3 <br /> In June 2006, FDEP issued the S WDD with a permit for the vertical expansion that includes the <br /> construction of a liner system over the top slopes of the previously-capped Segment 1 of the <br /> Class I landfill and raising the final elevation of the lined Class I landfill from the 145 ft NGVD <br /> to approximately 185 ft NGVD . This additional permitted capacity extends the life of the Class I <br /> landfill until January 2011 , based on current and projected waste acceptance rates . <br /> PROPOSED SCOPE OF WORK <br /> This project includes professional engineering services that will be performed for the design, <br /> permitting, and construction certification for closure of the C&D debris over the slopes of <br /> Segment 1 Class I landfill at the IRCL facility. The proposal also includes the development of <br /> landfill GCCS design and phasing plans for the Class I landfill cells . The scope of work is based <br /> on the requirements of Chapter 62-701 , Florida Administrative Code (FAC) and Geosyntee ' s <br /> understanding of the project based on information provided by the S WDD . <br /> Geosyntec will provide all engineering services necessary to complete the engineering design , <br /> permit applications , and address requests for additional information from FDEP related to the <br /> closure design. The scope of services also includes construction support services such as <br /> preparing construction bid documents, construction management, and CQA monitoring and <br /> certification services for the closure of the C&D debris on the Segment 1 slopes . The scope of <br /> services also includes the design of the GCCS for the Class I landfill vertical expansion under <br /> final conditions. and GCCS phasing for five, one-year increments . For budgeting purposes, the <br /> scope of work will be performed in three tasks , as presented below . <br /> Task 1 : General Consulting/Meeting Support/Project Management <br /> Task 2 : Closure of C&D Debris on Segment 1 Landfill <br /> • Phase 1 : Engineering Design ; <br /> • Phase 2 : Permit Application ; <br /> • Phase 3 : Response to Regulatory Comments; <br /> • Phase 4 : Construction Procurement Services; and <br /> • Phase 5 : Construction Support Services <br /> Task 3 : GCCS Plan <br /> • Phase 1 : GCCS Design Plan; and <br /> XL06230/01 - 17-2007 JL70002_doe <br /> urli; ineer , I scientists I innovators <br />