Laserfiche WebLink
D. Design Plans <br /> Design plans shall be prepared to include : <br /> The following plan sheets will be prepared: <br /> 1. Cover Sheet <br /> 2. Typical Sections <br /> 3. Summary of Quantities & General Notes <br /> 4. Horizontal & Vertical Control Sheet <br /> 5. Details <br /> 6. Plan and Profile Sheets (1 " = 40') with Aerial images obtained via 43'd Avenue right- <br /> of-way map under separate contract <br /> 7. Cross Sections <br /> 8. Signage & Pavement Marking Plans <br /> 9. Signalization Plans <br /> 10. Bridge Plans <br /> Il. Plateau Intersection Plan & Details <br /> 12. Summary of Drainage Structures Sheets <br /> 13. Drainage Maps <br /> 14. NPDES Storm water Pollution Protection Plans <br /> 15. Quantity Computation Book <br /> The plans will be prepared based upon English units. <br /> The following items are NOT included.- <br /> 1. <br /> ncluded:1. Drainage Structure Sheets <br /> 2. Geometric Computation Book <br /> 3. Utility Relocation Plans <br /> The following additional data shall be utilized for development of the plans. <br /> 1 . Scale: The design plans sheets will be drawn at a scale of 1 " = 40'. <br /> 2 . All plan sheets shall be 11 " x 17". <br /> 3 . The design plans will be submitted to the COUNTY for review at the 30%, 90% and 100% <br /> stages of design. Permit application submittals will be made subsequent to the 90% plan set <br /> submittal approval by the COUNTY. <br /> E. Computation Book <br /> The 100% submittal shall include a computation book with quantity calculations for all pay items. <br /> F. Drainage Plans <br /> 1 . Drainage Parameters: ARCADIS will design a pipe and inlet drainage system for <br /> the project. ARCADIS will perform storm water drainage hydrologic and hydraulic <br /> calculations to determine the pipe sizing, water quality treatment, and storm water <br /> attenuation requirements within the project limits. <br /> Offsite storm water ponds may be required for the project. ARCADIS will analyze <br /> alternative measures for water quality treatment and attenuation. Tile alternative <br /> measures will be reviewed with Indian River County. Preparation of final plans for <br /> storm water ponds is not included in this agreement, but will be incorporated into the <br /> project through an addendum once the final drainage requirements are determined. <br /> Page 6 of 16 <br /> F:\Public Works\Capital Projects\43rd Avenue- Oslo to 8th Street\43rd Avenue Arcadis Agrement 8-29-06.doc <br />