Laserfiche WebLink
TABLE 4 <br />VACUUM SEWER SYSTEM IMPROVEMENTS <br />LIST OF PROJECT DELIVERABLES <br />PRELIMINARY DESIGN PHASE <br />A. Design Location Survey <br />B. Geotechnical Investigation <br />C. Boundary and Topographic Survey <br />D Public meeting <br />E. Preliminary Design Report (25% Design). Five sets for review by CLIENT. <br />FINAL DESIGN PHASE <br />A. 50% Design Submittal <br />Project specific documents including drawings on 1 I x 17 sheets and specifications on 8-1/2 x <br />1 I sheets for review by CLIENT. Five (5) sets, 50% complete. <br />B. 75% Design Submittal <br />Project specific <br />documents including drawings on 11 x <br />17 sheets and <br />specifications on 8-1/2 x <br />I 1 sheets for review <br />by CLIENT. Five (5) sets, 75% <br />complete. <br />C. 100% Design Submittal <br />Project specific documents including drawings on l I x 17 sheets and specifications on 8-1/2 x <br />I l sheets for review by CLIENT. Five (5) sets, 100% complete. <br />D. Final Design Submittal <br />Project specific <br />documents <br />including drawings on 22 x 34 sheets and project specific <br />_specifications on <br />8-1/2 x I 1 <br />loose sheets for reproduction <br />by CLIENT. <br />Final estimate of probable construction cost. <br />CONSTRUCTION PHASE <br />A. Shop Drawings <br />2 Copies of accepted and final shop drawings. <br />Page 15 of l7 <br />