Laserfiche WebLink
E. Easements <br />For services enumerated in Article 1, Section D - Easements, the hourly rate specified in <br />Table A for personnel working directly on the project plus direct expenses in connection <br />therewith. There is no upset limit proposed for this portion of the work. <br />The budget for direct expenses in the design phase is $40,000.00 <br />These fees have been determined in accordance with the scope of work breakdown attached. <br />This proposal does not include the provision of the following items: <br />Any hydrogeologic work required for the design of the dewatering systems or to evaluate the <br />impact of construction dewatering systems for contamination sites within a quarter -mile <br />radius of this project site. <br />Easement acquisitions and legal work as required. <br />Payment of permitting fees. <br />ARTICLE 3 - DATA OR ASSISTANCE TO BE PROVIDED BY CLIENT <br />A. Provide copies of existing record drawings for all water and wastewater facilities impacted in the <br />project areas. <br />B. Provide assistance with regulatory agencies and payment of all permitting fees. <br />C. Provide assistance with final location of vacuum station site. <br />(Remainder of this page left blank intentionally) <br />Page 8 of 17 <br />