Laserfiche WebLink
TABLE I <br />VACUUM SEWER SYSTEM IMPROVEMENTS <br />TENTATIVE LIST OF DRAWINGS <br />Drawing Sheet No. Title <br />General <br />Architectural <br />A-1 Vacuum Pump Station Floor and Roof Plans <br />A-2 Vacuum Pump Station Elevations <br />A-3 Finish, Louver, A/C and Exhaust Fan Schedules <br />Page 9 of 17 <br />Cover sheet <br />G-1 <br />Index to Drawings and Project Location Map <br />G-2 <br />General Notes and Abbreviations <br />G-3 <br />Mechanical Legends and Symbols <br />G-4 <br />Piping Schedule and Legends <br />G-5 <br />Process and Instrumentation Legends <br />G-6 <br />Electrical, Architectural and HVAC Legends <br />G-7 <br />Project Key Map - North <br />G-8 <br />Project Key Map - South <br />Civil/Mechanical <br />C- <br />t to C-40 <br />Vacuum Sewer Plan and Profile Sheets <br />C-40 <br />to C-42 <br />Additional Force Main Plan Sheets <br />C-43 <br />Vacuum Pump Station Site Plan <br />C-44 <br />Vacuum Pump Station Mechanical Plan <br />C-45 <br />Vacuum Pump Station Sections and Details <br />C-46 <br />Vacuum Pump Station Sections and Details <br />C-47 <br />Standard Details - Civil/Mechanical <br />C-48 <br />Standard Details - Civil/Mechanical <br />C-49 <br />Standard Details - Civil/Mechanical <br />C-50 <br />Standard Details - Civil/Mechanical <br />C-51 <br />Standard Details - Civil/Mechanical (Airvac) <br />C-52 <br />Standard Details - Civil/Mechanical (Airvac) <br />C-53 <br />Standard Details - Civil/Mechanical (Airvac) <br />Architectural <br />A-1 Vacuum Pump Station Floor and Roof Plans <br />A-2 Vacuum Pump Station Elevations <br />A-3 Finish, Louver, A/C and Exhaust Fan Schedules <br />Page 9 of 17 <br />