Laserfiche WebLink
ENGINEERING SCOPE ASSUMPTIONS : <br /> In developing this Scope of Services, the following assumptions were made. Any deviation from <br /> these assumptions may require additional work and corresponding adjustments to the project budget <br /> and completion schedule. <br /> 1 . The site survey will be based upon the boundary survey and legal description provided by <br /> SWDD . No abstract or title work for potential easements, ownership conflicts, liens, etc . on <br /> the property are included in this Scope of Services . <br /> 2. The project site currently lies within two governmental boundaries, being unincorporated <br /> Indian River County and the City of Fellsmere. The large majority of proposed site <br /> improvements lie within the City of Fellsmere. This Scope of Work is based upon site <br /> planning and approval from the City of Fellsmere. No joint site planning approval, other <br /> than the C .R. 512 roadway improvements, are anticipated in this Scope of Services . If <br /> necessary for approval, this Scope of Services anticipates the County executing a unity of <br /> title between the two parcels and voluntary annexation into the City of Fellsmere. <br /> 3 . This Scope of Services is based on less than 1 acre of total on-site wetlands . <br /> 4. The facility is to remain a Convenience Center as defined by the FDEP, and as such will not <br /> require FDEP permitting for a Transfer Station. <br /> 5 . Geotechnical work excludes any cost for selective clearing needed to gain access to the site <br /> boring locations . <br /> 6. All engineering services are based upon the design and permitting of "on-site" <br /> improvements. "Off-site" improvements are limited to right-of-way conduit/pipe crossings <br /> needed to extend utilities and adjacent roadway improvements needed to construct right and <br /> left hand turn lanes into the project site. <br /> 7 . This Scope of Services does not include engineering services associated with zoning change, <br /> land use change, special exception, or subdivision platting. <br /> 8 . This Scope of Services does not include permitting for disposal of any existing on-site <br /> hazardous or industrial waste material. All permitting of hazardous or industrial waste <br /> disposal shall be conducted by "others". <br /> 9. Life Safety Plans and other building design features requiring the services of a Licensed <br /> Florida Architect, will not be required. <br /> 10 . All fees associated with site plan review and approval and permitting shall be the <br /> responsibility of the SWDD . <br /> SA041077"dndian River County SWDDTellsmere Convenience CenterlAttachment l .doc Page 8 of 8 <br />