Laserfiche WebLink
1 . Topographic and Right-of-Way Survey — Survey a minimum 500 feet east and west of the <br /> project site along C.R. 512. Set a survey baseline within right-of-way and perform right of <br /> way survey for C .R. 512 and adjacent platted right-of-ways . Conduct cross sections at 100 <br /> foot intervals. Perform topographic survey to locate major grade breaks, above ground <br /> features, and observable underground utilities. Delineate approximate extents of wetland <br /> ditches within right-of-way. Prepare survey plan drawing of the C .R. 512 right-of way, <br /> meeting the Florida Minimum Technical Standards. <br /> 2 . Roadway Improvement Design — Meet with IRC Traffic and Engineering Departments to <br /> obtain concurrence of final design requirements for turn lanes into the facility. Design new <br /> right hand turn, left hand turn, and thru, lanes. Design shall incorporate : utility adjustments; <br /> erosion control; earthwork; stormwater treatment and conveyance; grading; paving; striping; <br /> signage (no signalization); and traffic control during construction. Design shall conform to <br /> the requirements of Chapter 952 of the Indian River County LDR. <br /> 3 . Construction Documents - Prepare plans, details and specifications for bidding and <br /> construction of the off-site roadway improvements. It is anticipated the off-site roadway <br /> improvements will be bid along with the on-site improvements project. If, prior to document <br /> development, the Owner wishes to bid the off-site roadway improvements separately, the <br /> technical construction documents will be furnished as a stand alone set at no additional cost. <br /> This would include a separate project cover sheet. <br /> 4. Permitting — Engineer shall prepare applications, exhibits and project documentation for <br /> assisting the Owner obtain the following permits : <br /> • St. Johns River Water Management District E .R.P. permit <br /> • IRC Engineering Right-of-Way permit <br /> • FDEP Water and Sewer General Utility permits (if needed) <br /> • Fellsmere Water Control District connection permit (if needed) <br /> • FDEP NPDES Construction Stormwater Pollution Prevention permit <br /> 5 . Roadway Improvement Construction Inspection - Provide part time project inspector for <br /> duration of time required to meet permit conditions and provide routine reporting of <br /> substantial construction activities to the SWDD Project Manager. This scope is based upon <br /> the provision of 80 hours (2 hours/weekday) of "on-site" inspection during a maximum three <br /> month construction period. Perform up to 5 professional site inspections to substantiate <br /> Contractor' s application for payments and to attend substantial and final completion <br /> inspections. <br /> 6 . Project Completion and Certification — Using "as-built" survey information provided by the <br /> Contractor and Engineer' s inspection notes, prepare punch list. Upon punch list completion, <br /> revise plans to indicate "as-built" conditions. Complete and submit certification forms and <br /> "as-builts" to authorities having jurisdiction. <br /> S:\041077\Indian River County SWDDTellsmere Convenience CenterWttaehnnent l .doc Page 7 of 8 <br />