Laserfiche WebLink
Exhibit A <br /> CARTER ASSOCIATES, INC . <br /> CONSULTING ENGINEERS AND LAND SURVEYORS <br /> 1708 31st STREET NARN' IN r. ( ,,kRFER. PS. NI- <br /> VERO REACH. FLORIDA 32960-3472 DEIN E H ElrIJP, PR. it <br /> 772-5624191 <br /> 772-502-7180 ( FAX) JOHN 11. IIIA NI. f I.. <br /> PRNNA S. CE'CCURFtil9, CSM. <br /> DA\'I l) E. I (TI�I'HJE. PS. M- <br /> G. SEAN M( .cnueE. PF, <br /> GIl( )RGE SIMONS. PF <br /> November 13 , 2006 S I LN 1=. SNOBERGER, PE_ <br /> PATRICK S WAITHM RE. <br /> Mr. Christopher J. Kafer, P-E. , County Engineer <br /> Engineering Division <br /> Public Works Department <br /> Indian River County <br /> 1840 25 `° Street <br /> Vero Beach, FL 32960 <br /> Re : IRC Parks Maintenance Complex (CAI Project No. 05-60E) <br /> Professional Civil Engineering Services Agreement <br /> Dear Chris: <br /> We are pleased to present this proposed scope of services and fees to provide professional services relative to <br /> environmental investigation, civil engineering, site planning, landscaping, site lighting, permitting, and <br /> construction services for the new Parks Maintenance Complex to be located on a 5t acre portion of Hobart <br /> Park on 77" Street, Indian River County, Florida. The following describes our proposed scope of services: <br /> Environmental Investigation - CAI will provide the services of an approved environmental sub-consultant <br /> who will conduct an environmental investigation . He will flag the limits of existing wetlands, and will <br /> identify the presence of protected species (gopher tortoises). CAI will provide a report of the findings, to <br /> include a map of any issues discovered on the site. <br /> Preliminary Design - CAI will prepare preliminary infrastructure design drawings based on the conceptual <br /> layout provided by the COUNTY . The preliminary infrastructure design drawings will include plan views of <br /> paving, grading, drainage, landscaping, water, and sewer improvements. The plans will be prepared in <br /> accordance with Indian River County Land Development Regulations. CAI will coordinate geotechnical <br /> investigations to be conducted by others and paid for separately by the COUNTY. CAI will provide the <br /> services of an electrical engineering sub-consultant to design the site lighting. CAI will meet with COUNTY <br /> staff to review and discuss the preliminary design drawings and the results from the environmental and <br /> geotechnical investigations. <br /> Site Planning - CAI will prepare and submit a pre-application meeting application and shall attend the pre- <br /> application meeting with Indian River County Community Development Department staff. CAI will address <br /> the pre-application meeting comments and shall prepare and submit a site plan application for review and <br /> approval by the Indian River County Technical Review Committee . CAI will attend the TRC meeting and <br /> will address comments from the TRC. In addition , CAI will prepare and submit a traffic impact statement, <br /> land clearing and tree removal permit applications, NPDES permit data, and a concurrency determination <br /> request to Indian River County . <br /> Final Design & Permitting - CAI will make revisions to preliminary design drawings as required based on <br /> review comments and the COUNTY ' S input. CAI will prepare final construction drawings, details and <br /> specifications for proposed infrastructure improvements including paving, grading, striping, pedestrian <br /> A k •nvig Ilonda <br /> N TSWT05-60EvProposal I 1 - 13 -06.doc CA1911( c 1911 <br />