My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-011
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 11:44:15 AM
Creation date
9/30/2015 10:28:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2007
Control Number
2007-011
Agenda Item Number
11.I.1
Entity Name
Carter Associates
Subject
IRC Parks Maintenance Complex Work Order No.1
Area
IRC Parks Maintenance Complex
Supplemental fields
SmeadsoftID
6047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 . Infrastructure improvements shall be a single design for one phase of construction . <br /> 6 . All items are in reference to "on -site" improvements only. Should development thresholds trip <br /> requirements for any "off-site" improvements beyond potable water and sanitary sewer service <br /> connections at the property boundary, such services are not included in this Scope. <br /> 7 . The fee/time allocated for construction administration services is based on our past experience with <br /> projects of similar size and complexity, and it is subject to change based on the contractor' s <br /> performance and the project ' s actual progress . <br /> 8 . Construction services such as preparation of contract bid documents, bidding, negotiations with <br /> contractors, construction staking, construction surveying, etc . , are excluded from this Scope of <br /> Services. Coordination with and assisting the COUNTY staff in assembling the bid documents and <br /> reviewing the bids received is included, as is cooperating with the Contractor ' s surveyor to locate <br /> references for horizontal and vertical control on the site . <br /> 9. We assume no work will be in wetlands or jurisdictional lands, and that no endangered species are <br /> on site. No dredge and fill permitting is included_ No preparation of a wetland mitigation plans is <br /> included. No endangered species permitting is included. No responses to agency requests for <br /> additional information relative to wetlands, wetland mitigation, or endangered species are included. <br /> 10 . To the fiillest extent permitted by law, the COUNTY shall indemnify and hold harmless CAI, its <br /> employees and agents from and against all claims, losses, damages, and costs (including but not <br /> limited to court or other dispute resolution costs, and the time of CAI expended in defense of such <br /> claims) caused by, arising out of or relating to the presence, discharge, dispersal, release or escape of <br /> any environmental hazard at, on, under or from the project site. <br /> 11 . Preparation of easement descriptions and easement sketches are not included. Coordination with <br /> electric, phone, and fiberoptic utility owners for installation of their services to this site is included . <br /> 12 . Irrigation design is not included. Minimum landscaping design shall be provided to meet the <br /> property buffer requirements of the Land Development Regulations. <br /> Compensation: CAI will generally bill the COUNTY monthly on approximately the 10 " day of each month <br /> for the previous month ' s charges. All tasks will be billed on a percentage complete/lump sum basis, plus <br /> direct expenses (as specified in the Agreement), as follows : <br /> Environmental Investigation <br /> - Site Report (Environmental Consulting Group) . . . . . . . . . . . $2, 600. 00 <br /> Preliminary Design <br /> Engineering (CAI) . . . .. . . . . . . . . . . . . . . . . .. . . .. . . . .. . . .. . . . . . .. . . .. . . . . . . . . . ..... ... . . ... . . . . . . . . . . . . . . . <br />. . . . .. . . . . . . . . . . . . $6, 500. 00 <br /> LandscapePlans (CAI). .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . $1,200. 00 <br /> Electrical Plans (Garrison Engineering Services) . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1, 987. 50 <br /> Site Planning <br /> Engineering (CAI) . . . . . . . . . . . . . . . . . . . .. .. . . . . .. . . . . . . . $4, 500. 00 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .. . . . . . . . . . . . . . . . . <br /> Final Design & Permitting <br /> Engineering (CAI) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . .. .. . . . . . . . . . . . . . . . . . . . . . .. <br />. . . . . . . . . . . . . . . . . . . . . . . $5, 500. 00 <br /> Pike 3 of 4 <br /> A ■■ Mniiig l4oud <br /> : . � I Sine ) - loll <br />
The URL can be used to link to this page
Your browser does not support the video tag.