Laserfiche WebLink
Work, of this Agreement and in accordance with the fee schedule in this <br /> Agreement, as approved by the COUNTY prior to commencement of any work <br /> performed. <br /> 7. If following execution of this Agreement the COUNTY proposes to construct <br /> the improvements in a revised phased manner which requires the preparation of <br /> plans or the need to obtain or modify permits previously obtained, the <br /> ENGINEER will be compensated for this effort in accordance with the approved <br /> fee schedule in a subsequent Amendment to this Agreement. No such additional <br /> work shall be initiated unless approved by the Indian River County Board of <br /> County Commissioners . <br /> 8 . Compensation to the ENGINEER for basic services shall be in accordance with <br /> Section V — Compensation, of this Agreement, as mutually agreed upon by the <br /> ENGINEER and COUNTY. <br /> B . Design Plans <br /> Design plans shall be prepared to include the following sheets : <br /> 1. Cover Sheet <br /> 2. Site Plan (1 "=40 ' or larger scale) <br /> 3. Paving, Grading & Drainage Plan <br /> 4. Paving, Grading & Drainage Details <br /> 5. Sedimentation & Erosion Control Plan & Details <br /> 6. Landscape Plan <br /> 7, Utility Plan <br /> 8. Utility Details <br /> The plans will be prepared based upon English units. The plans will be submitted to the <br /> COUNTY for review at the 90% and 100% stages of design . Permit application <br /> submittals will be made subsequent to the 90% plan set submittal approval by the <br /> COUNTY. <br /> C. Tabulation of Quantities <br /> The 100% submittal shall include a tabulation of quantity calculations for all pay items. <br /> D. Permits <br /> The ENGINEER shall prepare stormwater permit applications for the St. Johns River <br /> Water Management District, I RFWCD, FDEP ( water and sewer), FDEP (NOI for <br /> Construction Stormwater Permit), IRC Stonnwater, IRC Tree Removal and Clearing <br /> Permit for submittal by the COUNTY. This will consist of all required evaluation, <br /> Page 4 of 12 <br />