My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-011
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 11:44:15 AM
Creation date
9/30/2015 10:28:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2007
Control Number
2007-011
Agenda Item Number
11.I.1
Entity Name
Carter Associates
Subject
IRC Parks Maintenance Complex Work Order No.1
Area
IRC Parks Maintenance Complex
Supplemental fields
SmeadsoftID
6047
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work, of this Agreement and in accordance with the fee schedule in this <br /> Agreement, as approved by the COUNTY prior to commencement of any work <br /> performed. <br /> 7. If following execution of this Agreement the COUNTY proposes to construct <br /> the improvements in a revised phased manner which requires the preparation of <br /> plans or the need to obtain or modify permits previously obtained, the <br /> ENGINEER will be compensated for this effort in accordance with the approved <br /> fee schedule in a subsequent Amendment to this Agreement. No such additional <br /> work shall be initiated unless approved by the Indian River County Board of <br /> County Commissioners . <br /> 8 . Compensation to the ENGINEER for basic services shall be in accordance with <br /> Section V — Compensation, of this Agreement, as mutually agreed upon by the <br /> ENGINEER and COUNTY. <br /> B . Design Plans <br /> Design plans shall be prepared to include the following sheets : <br /> 1. Cover Sheet <br /> 2. Site Plan (1 "=40 ' or larger scale) <br /> 3. Paving, Grading & Drainage Plan <br /> 4. Paving, Grading & Drainage Details <br /> 5. Sedimentation & Erosion Control Plan & Details <br /> 6. Landscape Plan <br /> 7, Utility Plan <br /> 8. Utility Details <br /> The plans will be prepared based upon English units. The plans will be submitted to the <br /> COUNTY for review at the 90% and 100% stages of design . Permit application <br /> submittals will be made subsequent to the 90% plan set submittal approval by the <br /> COUNTY. <br /> C. Tabulation of Quantities <br /> The 100% submittal shall include a tabulation of quantity calculations for all pay items. <br /> D. Permits <br /> The ENGINEER shall prepare stormwater permit applications for the St. Johns River <br /> Water Management District, I RFWCD, FDEP ( water and sewer), FDEP (NOI for <br /> Construction Stormwater Permit), IRC Stonnwater, IRC Tree Removal and Clearing <br /> Permit for submittal by the COUNTY. This will consist of all required evaluation, <br /> Page 4 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.