ATTACHMENT 1 to WORK ORDER NO. 1 <br /> I . PURPOSE <br /> This Work Order shall include those services associated with the engineering design , <br /> preparation of construction drawings , development of technical specifications and <br /> construction contract documents , preparation of environmental permitting documents , and <br /> other support services for the proposed Egret Marsh Regional Stormwater Park , including <br /> coordination with the Engineer responsible for the design and supply of the proposed <br /> Managed Aquatic Plant System ( MAPS) , specifically the Algal Turf Scrubber® (ATSTM) or <br /> ("ATSTM Project" ) . Portions of this project are described in general in the document entitled <br /> " Egret Marsh Regional Stormwater Management Facility" , which is DEP Agreement No . <br /> G0143 for a 319 ( h ) program grant . The concept for the facilities is described in the " Final <br /> Preliminary Engineering Report - Egret Marsh Regional Stormwater Park" ( Preliminary <br /> Engineering Report) , prepared by Carter & Associates , Inc . and the CONSULTANT in <br /> September 2004 . It is assumed that the site for the treatment facilities will be a 35-acre <br /> parcel in Indian River County at the southeast corner of 74th Avenue and 4th Street . It is <br /> further assumed that no further consideration will be given to the water storage needs of a <br /> Calpine Corporation electrical generating plant potentially planned for that area . <br /> 2 . CONSULTANT ' S SERVICES <br /> The CONSULTANT shall complete final design , develop construction documents as <br /> applicable , prepare permit application documents , and provide construction administration <br /> services for all of the facilities included in the Egret Marsh Regional Stormwater Park , <br /> except those facilities and design services provided under a separate contract between the <br /> COUNTY and Hydromentia , Inc . or project services provided by the COUNTY . The scope <br /> of services below details the required work . In general , the stormwater treatment system <br /> may include the following facilities and site improvements : <br /> A . Influent Pumping Station and Force Main <br /> B . Pretreatment settling pond <br /> C . Intermediate lift station to the ATSTM Project <br /> D . ATSTM Project ( by others) <br /> E . Polishing pond <br /> F . On -site conveyance piping <br /> G . Earthwork associated with the ponds , and support areas exclusive of the <br /> ATSTM Project <br /> H . Access and internal roads <br /> I . Littoral zone design associated with the two pond elements <br /> J . Treatment wetland design ( by others ) <br /> K . Site stormwater management <br /> L . Site lighting , electrical distribution , communications , site plan , landscaping , <br /> etc . <br /> No water quality monitoring services included . <br /> PA2004\P1404-0037- 1400 IRC Continuing Services\ECT - Work Order # 1 - Draft. doc <br /> CC7 <br /> Environmental Consulting & Technology, Inc. <br />