Laserfiche WebLink
3. SCOPE OF SERVICE <br />The CONSULTANT's work shall include the following tasks: <br />Task 1 The CONSULTANT shall prepare a design memorandum that will <br />verify the unit processes that comprise the treatment train and revise <br />(if necessary) the preliminary engineering layout as presented in the <br />Preliminary Engineering Report. <br />Task 2 The CONSULTANT shall prepare construction drawings and technical <br />specifications for an influent delivery system to be located <br />downstream of the Lateral C water control structure, which may <br />include a pump station and a force main to the influent settling pond. <br />Task 3 The CONSULTANT shall prepare construction drawings and technical <br />specifications to convert one of the existing ponds on the project site <br />into an influent settling pond, including control structures and littoral <br />zone. <br />Task 4 The CONSULTANT shall prepare construction drawings and technical <br />specifications for a lift station and piping to convey the discharge flow <br />from the settling pond to the ATSTM <br />Task 5 The CONSULTANT shall prepare construction drawings and technical <br />specifications for a polishing pond, including piping from the ATSTM <br />and any control structures. Littoral zone, and/or discharge piping. <br />Task 6 The CONSULTANT shall use G. K. Environmental, Inc. to help <br />prepare construction drawings and technical specifications for a <br />treatment wetland, including any control structures and/or piping. <br />Task 7 The CONSULTANT shall prepare construction drawings and technical <br />specifications for site improvements such as site stormwater <br />management facilities, parking, internal roadways, landscaping, etc. <br />Task 8 The CONSULTANT shall assemble all construction documents (plans <br />and technical specifications), including the engineering drawings and <br />specifications for the ATSTM unit as prepared by HydroMentia, and <br />prepare and submit a St. Johns River Water Management District <br />(SJRWMD) Environmental Resource Permit (ERP) application, and <br />provide any additional information required. The CONSULTANT shall <br />prepare and submit an application for review of an Indian River <br />County site plan, including concurrent review of a COUNTY <br />stormwater management plan permit application. The CONSULTANT <br />shall respond to any requests for additional information and address <br />any comments. <br />PA2004\P1404-0037-1400 IRC Continuing Services\ECT - Work Order #1 - Draft.doc <br />CC7 <br />Environmental Consulting & Technology, Inc. <br />