My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-195b
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-195b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:49:44 AM
Creation date
9/30/2015 8:50:05 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/07/2005
Control Number
2005-195
Agenda Item Number
11.I.1
Entity Name
Environmental Consulting & Technology, Inc.
Subject
Egret Marsh Regional Stormwater Park System
Work Order No.1 Attachment 1
Algal Turf Scrubber
Area
Egret Marsh Regional Stormwater Park SEcorner 74th Ave.-4th St.
Supplemental fields
SmeadsoftID
4976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. SCOPE OF SERVICE <br />The CONSULTANT's work shall include the following tasks: <br />Task 1 The CONSULTANT shall prepare a design memorandum that will <br />verify the unit processes that comprise the treatment train and revise <br />(if necessary) the preliminary engineering layout as presented in the <br />Preliminary Engineering Report. <br />Task 2 The CONSULTANT shall prepare construction drawings and technical <br />specifications for an influent delivery system to be located <br />downstream of the Lateral C water control structure, which may <br />include a pump station and a force main to the influent settling pond. <br />Task 3 The CONSULTANT shall prepare construction drawings and technical <br />specifications to convert one of the existing ponds on the project site <br />into an influent settling pond, including control structures and littoral <br />zone. <br />Task 4 The CONSULTANT shall prepare construction drawings and technical <br />specifications for a lift station and piping to convey the discharge flow <br />from the settling pond to the ATSTM <br />Task 5 The CONSULTANT shall prepare construction drawings and technical <br />specifications for a polishing pond, including piping from the ATSTM <br />and any control structures. Littoral zone, and/or discharge piping. <br />Task 6 The CONSULTANT shall use G. K. Environmental, Inc. to help <br />prepare construction drawings and technical specifications for a <br />treatment wetland, including any control structures and/or piping. <br />Task 7 The CONSULTANT shall prepare construction drawings and technical <br />specifications for site improvements such as site stormwater <br />management facilities, parking, internal roadways, landscaping, etc. <br />Task 8 The CONSULTANT shall assemble all construction documents (plans <br />and technical specifications), including the engineering drawings and <br />specifications for the ATSTM unit as prepared by HydroMentia, and <br />prepare and submit a St. Johns River Water Management District <br />(SJRWMD) Environmental Resource Permit (ERP) application, and <br />provide any additional information required. The CONSULTANT shall <br />prepare and submit an application for review of an Indian River <br />County site plan, including concurrent review of a COUNTY <br />stormwater management plan permit application. The CONSULTANT <br />shall respond to any requests for additional information and address <br />any comments. <br />PA2004\P1404-0037-1400 IRC Continuing Services\ECT - Work Order #1 - Draft.doc <br />CC7 <br />Environmental Consulting & Technology, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.