2005-195a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-195a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:49:24 AM
Creation date
9/30/2015 8:49:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/07/2005
Control Number
2005-195A
Agenda Item Number
11.I.1
Entity Name
Hydromentia, Inc.
Subject
Egret Marsh Regional Stormwater Park System
Work Order No.1
Area
Egret Marsh
Supplemental fields
SmeadsoftID
4975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e 4 <br />ATTACHMENT 3 to WORK ORDER NO. 1 <br />1s TIME FOR COMPLETION <br />The proposed timeline for the first four tasks are noted in Figure A. The start time is <br />shown as 5/2/05, and will be adjusted to coincide with actual date of the Notice -to - <br />Proceed from the COUNTY, with final design completed within 103 work days, <br />assuming delivery of County provided site topographical and boundary surveys, and <br />identification of, and access to, the site is sufficiently timely to permit initiation of the <br />work elements (sub -tasks) within the time allowances noted. <br />Figure A: Projected timeline for Task 1 through 4 <br />ID <br />Task Name <br />Duration <br />Start <br />Finish <br />rid <br />Quarter 3rd Quarter 4th Cu <br />B <br />M <br />E <br />B <br />M <br />E B <br />M <br />E <br />B <br />M <br />E <br />B <br />M <br />E B <br />M <br />E <br />B <br />M <br />1 <br />MJ <br />Analysis of Existing Water Quality and Flow Data <br />Collection and Compilation of historical data <br />Analysis of data, initial basis of design <br />Pre -Construction Water Quality Monitoring <br />Establish sampling program <br />Complete sampling and analyses <br />Submit Final Basis of Design <br />Monitoring and Quality Assurance Plan <br />Selection of Laboratories <br />Preparation of Plan <br />Initial Plan Submittal <br />Final Plan Submittal <br />System Design <br />20% Design <br />Soils Testing and Analysis <br />ATSDEM-REV modeling <br />Conceptual She Layout <br />Composting Design Mix <br />Rough Grading Plan <br />Initial Hydraulic Profile <br />Submit 20% design <br />50% Design <br />Final Grading and Site Plan <br />Typical sections/detail <br />Equipment, Construction and Materials Specifications <br />Hydraulic Structures sizing and layout <br />Initial Engineering Cost Estimate <br />Submit 50% design <br />100% Design <br />Structural Details <br />HDPE Design <br />Electrical and Instrumentation <br />Construction Documents <br />Estimated Construction Schedule <br />Final Engineering Estimate <br />Submit 100% design <br />Final Contract and Construction Documents <br />receive comments on 100% design <br />submit final documents <br />10 days <br />5 days <br />10 days <br />28 days <br />3 days <br />20 days <br />0 days <br />22 days <br />7 days <br />14 days <br />0 days <br />0 days <br />103 days <br />51 days <br />15 days <br />5 days <br />14 days <br />10 days <br />5 days <br />15 days <br />O days <br />32 days <br />8 days <br />15 days <br />10 days <br />8 days <br />20 days <br />0 days <br />40 days <br />10 days <br />20 days <br />14 days <br />20 days <br />14 days <br />10 days <br />0 days <br />9 days <br />8 days <br />0 days <br />Mon 5/2105 <br />Mon &2/0E <br />Mon 5/2/0.. <br />Mon 5/2105 <br />Mon 5/2/0. <br />Thu 5/5/0. <br />Wed 818/0. <br />Mon 512/05 <br />Mon 51210E <br />Thu 5/5/05 <br />Tue 5/24/05 <br />Tue 5/31/05 <br />Mon SW05 <br />Mon 5f2/05 <br />Mon 5/2/0. <br />Thu &2/05 <br />Thu 5/26/05 <br />Thu 6/2/05 <br />Fri 6110/0. <br />Tue 6/7/05 <br />Mon 7/11/OE <br />Tue 7/5/05 <br />Tue 7/12/05 <br />Tue 7/5/05 <br />Tue 7/19/05 <br />Fri 7/15/0E <br />Wed 7/20/0. <br />Wed 8/17/0. <br />Fd 7/15/05 <br />Fri 7/2910E <br />Fri 7/15/0E <br />Thu 8/11/05 <br />Tue 7/26/05 <br />Wed 8/17/05 <br />Thu 8/25/05 <br />Thu 9/8105 <br />Fri 9/9/05 <br />Fri 9/910. <br />Wed 92110E <br />Fd U13105 <br />Fri 5/&0. <br />Fri 5/13/0E <br />Wed 618/05 <br />Wed 5/4/0! <br />Wed 6/1/CF <br />Wed 81810E <br />Tue 5/31/05 <br />Tue 5/10/0E <br />Tue 5/2410E <br />Tue 5/24/0E <br />Tue 5/31/01! <br />Wed 9121/05 <br />Mon 7/11/0$ <br />Fri 5/20/01! <br />Wed &8/OE <br />Tue 6/14/OE <br />Wed 811510E <br />Thu 8/1610E <br />Mon 6/27/OE <br />Mon 7/11/01! <br />Wed 8117/05 <br />Thu 7/21/0. <br />Mon 7/25/01! <br />Mon 8/1/OE <br />Tue 726/05 <br />Tue &1&OE <br />Wed 8/17/015 <br />Thu 9/8/05 <br />Thu 811110E <br />Thu &11/0. <br />Tue 8130/Of <br />Mon 812210E <br />Mon 91510f <br />Wed 9/7/0. <br />Thu 9/8/0E <br />Wed 9/21/05 <br />Tue 9/20/0! <br />Wed 921/0. <br />f <br />f <br />6/8 <br />5/24 <br />5/31 <br />7/11 <br />8117 <br />9/8 <br />9/21 <br />2 <br />3 <br />4 <br />5 <br />B <br />7 <br />8 <br />9.a <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />28 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />Note: Red Bars indicate critical path task <br />*END OF ATTACHMENT 3** <br />10 <br />F:\Public Works\KeithM\Stormwater Projects\Egret Marsh Regional Storriwater Park\Work Orders\Hydromenta - Work Order <br />#1.doc <br />