Laserfiche WebLink
Table 1: Lump Sum Fee Schedule Tasks 1 through 4. <br />a. Includes $500 rental fee for automatic sampler and $500 rental fee for generator. Work Order Fees <br />would be reduced by this amount ($1,000) if these items provided by the County. <br />b. Includes a $1,500 rental fee for a backhoe to be used for specific determination of C&D disposal <br />limits. Work Order Fees would be reduced by this amount ($1,500) if this item provided by the <br />County, or if an alternate site selected. <br />**END OF ATTACHMENT 2** <br />9 <br />F:\Public Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order <br />#1.doc <br />Lump <br />Start- <br />Completion <br />Task <br />Description <br />Deliverables <br />Sum Fee <br />date <br />Date <br />Task 1 <br />Analysis of Existing Water <br />$29770 <br />Initial Basis of <br />5/2/05 <br />5/13/05 <br />Qualityand Flow Data <br />Design <br />Task 2 <br />Pre -Construction Water <br />$7,255a <br />Final Basis of <br />5/2/05 <br />6/8/05 <br />QualityMonitoringDesign <br />Task 3 <br />Monitoring and Quality <br />Assurance Plan <br />$3,030 <br />Monitoring Plan <br />5/2/05 <br />5/31/05 <br />1. Soils Analysis <br />2. ATSDEM-REV <br />Model runs <br />3. Initial Hydraulic <br />Task 4a <br />20% Design <br />$271590° <br />Profile <br />5/2/05 <br />7/11/05 <br />4. Compost Design <br />Mix <br />5. Rough Grading <br />Plan <br />1. Final Grading <br />and Site Plan <br />2. Typical <br />sections/details <br />Task 4b <br />50% Design <br />$23,020 <br />3. Technical <br />7/5/05 <br />8/10/05 <br />Specification <br />4. Initial Cost <br />Estimate <br />1. Structural details <br />2. HDPE Design <br />3. Electrical Design <br />4.Construction <br />Task 4c <br />100% Design <br />$23,370 <br />Documents <br />7/15/05 <br />9/8/05 <br />5. Construction <br />Schedule <br />6. Final Cost <br />Estimate <br />Task 4d <br />Final Contract and <br />$8,400 <br />Final Construction <br />9/9/05 <br />9/21/05 <br />Construction Documents <br />Documents <br />TOTAL <br />WORK ORDER 1 <br />$95,435 <br />5/2/05 <br />9/21/05 <br />a. Includes $500 rental fee for automatic sampler and $500 rental fee for generator. Work Order Fees <br />would be reduced by this amount ($1,000) if these items provided by the County. <br />b. Includes a $1,500 rental fee for a backhoe to be used for specific determination of C&D disposal <br />limits. Work Order Fees would be reduced by this amount ($1,500) if this item provided by the <br />County, or if an alternate site selected. <br />**END OF ATTACHMENT 2** <br />9 <br />F:\Public Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order <br />#1.doc <br />