My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-195a
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-195a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 11:49:24 AM
Creation date
9/30/2015 8:49:59 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/07/2005
Control Number
2005-195A
Agenda Item Number
11.I.1
Entity Name
Hydromentia, Inc.
Subject
Egret Marsh Regional Stormwater Park System
Work Order No.1
Area
Egret Marsh
Supplemental fields
SmeadsoftID
4975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a composting plan and projection of composting performance; and a suggested rough <br />grading plan for the ATSTM Project, based upon previous boundary and topographic <br />surveys as provided by the COUNTY. Design elements not to be done by the <br />Consultant, but which need to be considered in establishing the ATSTM design include: <br />• Influent Pumping Station and Force Main <br />• Intermediate Lift Station, and associated piping for delivering flows <br />from a settling pond to the ATSTM <br />• Earthwork associated with the ponds, and support areas exclusive of <br />the ATSTM Project <br />• Littoral Zone design associated with the two pond elements <br />• Receiving wetland design, including effluent piping. <br />• Effluent piping <br />• Stormwater management for regions outside the ATSTM Project <br />• Site roads, lighting, electrical distribution, communications, security, <br />signage, fencing, grassing and landscaping. <br />• ERP permitting <br />These design elements need to be completed concurrent with the ATSTM Project design. <br />Accordingly, the Consultant shall work closely with the selected designer(s) for these <br />elements, and together with these designers, shall make every effort to ensure the <br />composite effort remains on schedule. <br />For purposes of this work order, the term ATSTM Project shall include all areas inside the <br />toes of the peripheral berm around the ATSTM itself; the ATSTM receiving box and piping <br />connections; flow surgers and distribution manifold; grading, HDPE geomembrane, and <br />geogrid matrix associated with the ATSTM floway; the ATSTM effluent flume; ATSTM flow <br />splitter structures, to include channel support for the Flex -Rake Harvesting unit; Flex - <br />Rake with necessary controls and appurtenances; connection(s) for ATSTM effluent <br />piping; ATSTM monitoring stations; composting areas, to include roadways connecting <br />ATSTM floway to composting area; operational and equipment support facilities; and <br />equipment as required to effectively support and operate the ATSTM Project, <br />Sub -Task 4b: 50% Design <br />The 50% design documents shall be as required for the ATSTM component for required <br />environmental permits. Procurement of Permits shall be by others. The Consultant shall <br />make 50% design submittals to the COUNTY, which shall include all elements <br />associated with the 20% design in addition to: <br />• Final Grading and Site Plan <br />• Typical details <br />• Typical sections <br />• Equipment, Materials and Construction Specifications <br />• Structure sizing and layout <br />6 <br />FAPublic Works\KeithM\Stormwater Projects\Egret Marsh Regional Stormwater Park\Work Orders\Hydromentia - Work Order <br />#1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.