Our File #0563 <br /> September 16 , 2005 <br /> NON-EXCLUSIVE PROFESSIONAL ENGINEERING AGREEMENT <br /> CONTINUING CONSULTING SERVICES <br /> ATTACHMENT 1 <br /> • Project Description <br /> Work Authorization # I provides for professional engineering services for the design, permitting, bidding <br /> and construction of a 16" brine force main for conveyance of brine from the North County R/O Water <br /> Treatment Facility. The proposed 16 " brine force main will terminate at the Spoonbill Marsh site along <br /> the Indian River Lagoon north of the North Relief Canal . In order to bring brine to the wetland project, <br /> a 16" pipeline will need to be constructed from the Bent Pine site where the existing 16" brine force <br /> main now terminates to the Spoonbill Marsh Wetland Brine Disposal site . <br /> Work Authorization No . 1 is being implemented at this time to provide professional engineering <br /> services by Masteller & Moler, Inc . associated with the project described above. The work to be <br /> performed as part of this Work Authorization will generally included preparation of project design for <br /> the proposed 16" brine pipeline, preparation of contract plans ; preparation of specifications and bid <br /> documents ; preparation and submittal of permit applications, assistance during bidding and contract <br /> administration/periodic inspection for the pipeline project. <br /> The estimated project construction cost is $ 800 , 000 . 00 <br /> A brief description of the scope of services for work Authorization No. 1 is provided below: <br /> • Scope of Services <br /> Task A — Construction Plans <br /> Masteller & Moler, Inc . will utilize route survey base plans provided by the County; and design and <br /> prepare construction plans for a 16" diameter force main to convey brine (concentrate) produced by the <br /> North County R/O Water Treatment Plant. An existing 16 " brine force main was constructed early in <br /> 2003 from the North County R/O Water Treatment Plant south along Kings Highway and east along 571h <br /> Street ending at the Bent Pine Reuse Basin site . This project will connect to the end of the existing 16" <br /> brine force main at the Bent Pine site and continue east across the Lateral G Canal along 57`h Street, <br /> through the Hawks Nest Golf Course crossing the FECRR, Old Dixie Highway and US # 1 before <br /> heading south and east through land under development to the Spoonbill Marsh Wetland Brine Disposal <br /> site . The total length of the pipeline is approximately 9 , 500 feet. Our plans will show the necessary <br /> gate valves, air release valves, jack and bore, directional boring, and construction details . <br />