My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-265
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 11:10:14 AM
Creation date
9/30/2015 9:00:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/02/2005
Control Number
2005-265
Agenda Item Number
11.I.2
Entity Name
Peninsula Hydrologic Data Specialists, Inc.
Subject
East Roseland Stormwater Improvement Project
Work Order No.1 Stormwater Samples
Area
Roseland Pond
Supplemental fields
SmeadsoftID
5114
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 1 to WORK ORDER NO. 1 <br /> OPERATION AND MAINTENANCE OF AUTOSAMPLER DATA <br /> COLLECTION SITES , RENTAL OF AUTOSAMPLER EQUIPMENT, AND <br /> COLLECTION AND DELIVERY OF STORMWATER SAMPLES FOR THE <br /> " EAST ROSELAND STORMWATER IMPROVEMENT PROJECT" <br /> 1 . SCOPE OF SERVICES <br /> The CONSULTANT shall assist the COUNTY as necessary so that the COUNTY <br /> complies with its stormwater sampling requirements at the East Roseland Stormwater <br /> Pond ( Roseland Pond ) on 135th Street , south of Roseland Road , in the community of <br /> Roseland . The CONSULTANT will adhere to all requirements set forth in the project' s <br /> approved Quality Assurance Project Plan (QAPP ) , included herein as Attachment 4 , <br /> The CONSULTANT will provide its own transportation , tools (to maintain ` normal ' <br /> QA performance ) , housekeeping products (e . g . pest control , spray lube ) , external <br /> dessicant , decontamination soap , QA forms , office supplies for site folders , battery charger <br /> for site batteries , and a laptop computer compatible with autosampler hardware . The <br /> CONSULTANT will also provide the necessary supplies for stormwater sample collection <br /> and site maintenance , including but not limited to : two automatic stormwater samplers <br /> capable of taking stormwater samples on a flow weighted basis , flow meters , batteries , <br /> PVC conduit , software , communication cords for instrument/laptop interface , <br /> miscellaneous hardware for site operation , and all other necessary appurtenances . <br /> The CONSULTANT will help install and will operate and maintain the two automatic <br /> stormwater samplers at the Roseland Pond and provide weekly inspection and <br /> maintenance visits . When stormwater samples are collected , the CONSULTANT will <br /> perform field measurements required by the QAPP and collect the samples , ice them as <br /> required , and deliver the samples to the COUNTY' s Central Wastewater Treatment Plant <br /> for pickup by the testing laboratory . <br /> The COUNTY will provide data parameter requirements ( necessary for proper <br /> instrument programming to satisfy FDEP requirements ) and guidance to contractor, a <br /> contractor identification badge , surveying services , and manpower services for special <br /> projects (e . g . installation of sampler security containers , removal/spraying of intrusive <br /> aquatic vegetation , etc. ) . The COUNTY will also provide two security containers for the <br /> CONSULTANT ' s automatic samplers . <br /> ** END OF ATTACHMENT 1 ** <br /> 2 <br /> CADocuments and settingAeithm\Local Settings\Temporary Internet Files\OLK2\IRCEROSELANDWO107 . 1105. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.