My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-265
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 11:10:14 AM
Creation date
9/30/2015 9:00:55 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/02/2005
Control Number
2005-265
Agenda Item Number
11.I.2
Entity Name
Peninsula Hydrologic Data Specialists, Inc.
Subject
East Roseland Stormwater Improvement Project
Work Order No.1 Stormwater Samples
Area
Roseland Pond
Supplemental fields
SmeadsoftID
5114
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East Roseland QAPP <br /> Section B <br /> Revision No . _ <br /> Date : 11 / 16/04 <br /> Page 18 of 22 <br /> 10 . Oil and Grease EPA 1664 <br /> 11 . Hardness SM2340B <br /> 12 , Zinc EPA 200 . 71 200 . 89 6010 , or 6020 <br /> 13 , Copper EPA 200 . 71 200 . 87 6010 , or 6020 <br /> 14 . Cadmium EPA 200 . 71 200 . 87 6010 , or 6020 <br /> 15 , Chromium EPA 200 . 71 200 . 89 6010 , or 6020 <br /> ** Field measurement performed by Michael Wickwire , of Peninsula hydrologic <br /> Data Specialists , Inc . <br /> B4 . 2 Validation Information for Non -Standard Methods <br /> Not applicable for this project . <br /> B4 . 3 Individuals Responsible for Corrective Action <br /> 1 . Field Measurements — Michael Wickwire of Peninsula hydrologic Data <br /> Specialists , Inc . <br /> 2 , Laboratory Measurements — Derrick M . Simons of U . S . Biosystems , Inc . <br /> B4 . 4 Special Laboratory Turnaround Time <br /> Not applicable this project . <br /> B5 . Quality Control Requirements <br /> B5 . 1 Purpose/Background <br /> QC checks will be performed throughout the Project to ensure the generation of <br /> reliable data . The equipment will be calibrated and programmed prior to <br /> installation at the Project site and a record of the calibration will be recorded in <br /> the field logs . The autosamplers will be checked periodically and after every <br /> rainfall event to ensure proper function . Additionally , Michael Wickwire will <br />
The URL can be used to link to this page
Your browser does not support the video tag.