My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-003
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 10:59:45 AM
Creation date
9/30/2015 10:28:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2007
Control Number
2007-003
Agenda Item Number
7.Q.
Entity Name
Masteller, Moler, Reed and Taylor
Subject
Right-of-Way Mapping Project - Indian River Drive Phase I
Work Order No. 10
Area
Indian River Drive with US Highway 1
Project Number
0634
Supplemental fields
SmeadsoftID
6036
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� . <br /> Board of County Commissioners <br /> 1810 25th Street <br /> Vero Beach, Florida 32960 <br /> Telephone : (772) 567-8000 FAX: 772-778-9391 <br /> WORK ORDER NO . 10 (Engineering) <br /> FOR <br /> PROFESSIONAL SURVEYING SERVICES AGREEMENT <br /> FOR ANNUAL SURVEYING AND MAPPING SERVICES <br /> 2006 —2007 CONTRACT 0390 <br /> WITH <br /> Masteller, Moler, Reed & Taylor, Inc. <br /> In accordance with Contract No. 0390 2006-2007 <br /> Project: <br /> Right-of-Way Mapping Project <br /> Indian River Drive Phase 1 <br /> IRC Project 0634 <br /> This Work Order No. 10 is in accordance with the existing AGREEMENT dated September 19th, <br /> 2006 between Masteller, Molar, Reed & Taylor, Inc. (SURVEYOR) and Indian River County <br /> (COUNTY) . This Work Order No. 10 amends the agreement as follows: <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No . 10 is for the SURVEYOR to perform a Right of Way Survey for the existing <br /> 66 foot wide Right of Way for Indian River Drive and prepare a Right of Way Map for Phase 1 of <br /> the project. The overall project limits range from the southern intersection of Indian River Drive <br /> with U . S. Highway No . 1 to the northern intersection of Indian River Drive with U .S . Highway <br /> No. 1 (approx. 3. 5 miles). Phase 1 of the project ranges from the northern overall project limits <br /> south to the northern City Limits of the City of Sebastian (approx. 1 . 5 miles) . All lying in Indian <br /> River County, Florida <br /> SECTION II - SCOPE OF SERVICES <br /> As agreed upon between Masteller, Moler, Reed & Taylor Inc. and Indian River County, the <br /> Surveyor shall provide Professional Land Surveying services to complete all tasks as outlined <br /> in this Work Order No. 10 described as follows: <br /> • Right of Way Survey. <br /> 1 . Establish and field locate the centerline of the existing 66 foot Right of Way for Indian <br /> River Drive from US1 to USI as described in Deed Book 538, Page 541 . <br /> 2 . Find or establish sectional data as necessary for establishing the Indian River Drive <br /> centerline and certify as required. Locate and identify existing Right of Way <br /> monumentation along the overall project limits. Prepare and record Certified Corner <br /> Reports as applicable to Florida Statutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.