Laserfiche WebLink
pump to the North Regional WWTP . Hydraulic modeling using Watercad will not be <br /> provided for the sewer system . <br /> An initial kick-off meeting to discuss available information and County standards to <br /> be used for this project will be conducted with IRC staff. <br /> Task 2 . Sanitary System Evaluation <br /> Consultant will review two different sewer system designs to be considered for Vero <br /> Lake Estates (VLE) — gravity-type and vacuum-type system . Consultant will review <br /> and present advantages and disadvantages of each type and provide recommendations <br /> for each based on these items . Some recent historical costs for these type systems in <br /> the geographic vicinity of Indian River County will be collected and provided . A <br /> cost/benefit evaluation will be provided under this task <br /> Task 3 . Prepare Opinion of Budget Costs <br /> The intent of this scope is to prepare a budget opinion of costs for the water/sewer <br /> system for each phase of the project . Estimated project costs were provided for water <br /> only in 1995 at an estimated cost of $ 1900/lot, however, given current market <br /> conditions, a more representative budget opinion of costs should be prepared . <br /> An opinion of overall probable construction costs with anticipated contingency' s will <br /> be prepared for each phase, including piping, valves , water services, sewer lateral <br /> connections , and hydrants . The opinions of costs will be budgetary in nature and <br /> more detailed costs can be prepared after detailed design is completed . <br /> Consultant will prepare a breakdown by phase and overall estimated costs as follows : <br /> 1 ) water only, 2) water & gravity, and 3 ) water & vacuum . The costs will include : <br /> contingency, survey, design, permitting, bidding, mobilization, & construction . <br /> Consultant will also include a preliminary schedule that outlines the beginning and <br /> completion of each phase . <br /> Task 4. Develop Survey Scope <br /> Consultant will develop a specific scope of services for the survey work to be <br /> completed . The same scope of services will be used for each of the five proposed <br /> phases . In order to tailor a scope of services for this project the Consultant will <br /> review the delineation of phases and the existing County utility survey specifications . <br /> The Consultant will participate in a site review with County staff to determine the <br /> level and limits of topographic information to collect and address any specific <br /> topographic requirements . Consensus on the utilization of rectified digital aerial <br /> photography will be sought. It is assumed that a digital base map of each phase will <br /> be developed based upon Indian River County GPS control points and tied to state <br /> plane coordinates . <br /> HAGeneral\Miller\Indian River CountyTroposals\vero Lake Estates-rev4.doc <br />