My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-134
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 4:17:12 PM
Creation date
9/30/2015 9:40:00 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
equipment choice and usage, sequence, schedule, safety programs, or safety practices, nor shall <br /> the Consultant have any authority or responsibility to stop or direct the work of any contractor. <br /> Start-up of the new pumps will be facilitated by the pump manufacturer' s representative and by <br /> the Contractor. The Consultant will observe start-up of the new pumps once the installation is <br /> completed. <br /> The Consultant will prepare record drawings of the repump station using information provided <br /> by the contractor. A set of Mylar reproducible drawings, an electronic copy in AutoCAD format <br /> on a CD-ROM, and two sets of prints will be delivered to Indian River County Utilities upon <br /> completion of this project. <br /> A request for final release of the modifications will be submitted to FDEP, including certification <br /> application and record drawings. <br /> A punch-list will be prepared for the items that need to be completed for final closeout of the <br /> project. The Consultant will perform two site visits with the contractor to review the status of <br /> the completion of these punch-list items. <br /> While it is not anticipated that there will be hazardous materials or conditions encountered on <br /> this project, should any such conditions be discovered during this scope of services, the <br /> Consultant shall notify the Client of hazardous substances or conditions not contemplated in this <br /> Scope of services of which the Consultant actually becomes aware. Upon such notice by the <br /> Consultant, the Consultant may stop affected portions of its services until the hazardous <br /> substance or condition is eliminated . The parties shall decide if the Consultant is to proceed with <br /> the services and if the Consultant is to conduct testing and evaluations, and the parties may enter <br /> into further agreements as to the additional scope, fee, and terms for such services . <br /> SCHEDULE <br /> Forcemain : Services for Task 1 are anticipated to be completed within 3 weeks of notice to <br /> proceed. Task 2 is anticipated to be completed within 12 weeks of Task 1 . Task 3 . 1 is <br /> anticipated to be completed within 7- 8 weeks after Task 2 is completed. Task 4 is anticipated to <br /> be completed within one week of Task 3 . 1 . Construction phase services (Task 5) are anticipated <br /> to take eight (8) months after the contractor begins work on the site. <br /> Re- Pump Station : Services for Task 3 . 2 are anticipated to be completed within 5 - 6 weeks . <br /> Task 6 is anticipated to be completed within 8 — 12 weeks from notice to proceed . Task 4 will be <br /> completed within one week at the conclusion of Task 3 .2 . Construction phase services (Task 5) <br /> are anticipated to take five (5) to seven (7) months after the contractor begins work on the site. <br /> FEES <br /> We will provide these services in accordance with our Continuing Services Contract Agreement <br /> for Professional Services dated April 6, 2004 with Indian River County. <br /> The Consultant will provide these additional services for a lump stun fee as follows : <br /> Task No. Task Task Fee <br /> Task 1 Route Evaluation 54, 500 <br /> F:AUtilitiesVUTILITY - ENGINEERING\Projects - Utility Construction Permits\IRC - Sth Street FM Ext from IR my to 58th AN, <br /> - UCP 2628 Work Order No. 12 to KH &AAA - Work Order No. 12 - March 29, 2006.doc <br /> Page 10 of I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.