Task 2 Survey, Utility Locates, Soil Borings $ 104,600 <br /> Task 3 . 1 Hydraulic Modeling $6,400 <br /> Task 3 . 2 Force main Design $ 85 ,000 <br /> Task 3 .2 Re-Pump Station Design $ 59,500 <br /> Task 4 Permitting $ 19,900 <br /> Task 5 . 1 Construction Phase Services, Force main $94,000 <br /> Task 5 .2 Construction Phase Services, Re-Pump Station $677400 <br /> Total Lum Sum Fee = $441 ,300 <br /> Additional Services : <br /> The following services are not included in the Scope of Services for this project, but may be <br /> required depending on circumstances that may arise during the execution of this project. Other <br /> items that may be considered additional services are mentioned herein . Additional services <br /> include, but may not be limited to the following: <br /> • Route evaluations beyond those described in Task 1 . <br /> • Attendance at more than those meetings described in the Scope of Services. <br /> • Design revisions other than those comment responses described in the Scope of Services. <br /> • Evaluation and design of odor control systems for the re-pump station other than the <br /> Biofilter system. <br /> • Revisions to the Owner' s contract documents <br /> INFORMATION PROVIDED BY OWNER: <br /> The Owner shall provide the following information related to the design of this construction <br /> project: <br /> • Record drawings of water and sewer utilities along the determined route <br /> • Record drawing of LS #89 <br /> • All information regarding existing wastewater flows associated with LS #89 <br /> • All information regarding future wastewater flows associated with LS #89 <br /> • Access to the site <br /> FAUtilitiesVUTILITY - ENGINE ER[NGAProjects - Utility Construction Peron IsV1RC - 8th Street FM Ext from IR [31v to 58th Av <br /> - UCP 2628 Work Order No. 12 to KH&AAA - Work Order No. 12 - March 29, 2006 .doc <br /> Page I 1 of I I <br />