Laserfiche WebLink
Attachment #1 <br /> Work Order Number 12 <br /> West Wastewater Transmission System <br /> Project Description and History <br /> The Indian River County Department of Utility Services (IRCU) December 2004 Master Plan <br /> identified multiple Capital Improvement Projects (CIP) that will transfer a portion of the existing <br /> wastewater flows from the South Wastewater Treatment Plant (WWTP) to the West WWTP . <br /> The West WWTP is currently under expansion as part of this Master Plan to accept this <br /> additional capacity. In conjunction with other ongoing CIP Projects, the intent of Work Order <br /> # 12 is to consolidate several projects into one that will transfer wastewater capacity from the <br /> South WWTP to the West WWTP . <br /> Work orders #7 and #8 were authorized by the BCC May 17, 2005 which included the <br /> construction of a master pump station at 8'h Street and 58th Ave (Kings Highway) and installation <br /> of 21 ,000 lineal feet of 12" force main along 8th Street, respectively. Both work orders included <br /> survey, design, permitting, and a construction phase services for these projects. Shortly <br /> thereafter, work order # 10 was authorized by the BCC June 21 , 2005 , for the extension of the 8 'h <br /> Street force main further west from Kings Highway to 74th Ave. The remaining force main <br /> piping to the West WWTP was being designed by others and would complete the westerly <br /> transmission of flow to the WWTP . The purpose of these projects was to transfer flow and <br /> wastewater (WW) capacity from the South WWTP to the West WWTP . <br /> Through preliminary evaluation of the 8th Street corridor under work order #8, it became evident <br /> that the availability of right-of-way was limited, and the presence of existing utilities did not <br /> allow adequate space for construction of anew force main. Right-of-way was limited to 60 ft in <br /> some areas, and the presence of other utilities and existing water lines along this corridor did not <br /> allow adequate construction of a new force main due to sanitary setback requirements between <br /> water and sewer lines . Alternate routes along 12th, 4th, and V Streets were evaluated to <br /> determine a better alignment for the new force main . Through various meetings with staff, 4"' <br /> Street was identified as an alternate east-west route to direct WW flow west to 58th Ave (Kings <br /> Highway) . <br /> In developing this route, a separate project to rehabilitate and upsize the existing master WW <br /> pump station #89 located at the South RO water treatment plant site was being considered . <br /> Increasing the capacity of this pump station was needed to meet growing demands in the South <br /> system. LS#89 currently pumps WW to the South WWTP . Consultant recommended utilizing <br /> this station as a master pump station in order to pump wastewater West via the 4th Street force <br /> main extension already under design in Work Order #8 to the West WWTP. Since the intent of <br /> routing a new 12" force main west was to pick up capacity from the Eastern basin, which <br /> included numerous lift stations, ALL of these lift stations in the Eastern basin already pumped to <br /> LS #89 . This configuration of extending the 4th Street force main to LS 489 and upsizing the <br /> pump station provides several advantages : <br /> • Allows ALL of the Eastern Basin flow to be directed to either the South or West <br /> W WTP ' s <br /> F:AUtilities\UTILITY - ENGINEER INGAProjeets - Utility Construction PermitsVIRC - 8th Street PM Ext from IR BIV to 58th Av <br /> - UCP 2628 Work Order No . 12 to KH &AAA - Work Order No. 12 - March 29, 2006.doc <br /> Page I of 11 <br />