My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-134
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 4:17:12 PM
Creation date
9/30/2015 9:40:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/18/2006
Control Number
2006-134
Agenda Item Number
11.J.2.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
West Wastewater Transmission System- Work Order No. 12
Supplemental fields
SmeadsoftID
5602
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• All of the operations required for a pump station can remain on-site of the existing <br /> facility and does not require additional monitoring of another remote facility. <br /> • Allows transfer of additional capacity of up to 1 . 0 rrgd additional beyond what the <br /> MasterPlan called for from the South WWTP to the West WWTP . <br /> Direction to proceed with survey from the LS#89 site up to 4th Street along the eastern side of the <br /> water plant site property boundary was initiated . However, with construction of a new 12" force <br /> main on the WTP site to serve the new developments North of the South RO WTP along 12th <br /> Street, limited space again' was available in this corridor (east property edge of WTP) for another <br /> larger force main. Additionally, IRCU staff preferred an alternate route off-site of the water <br /> treatment plant. Upon further review of the 4th Street corridor and in consideration of tie-ing in <br /> to LS #89, an alternate corridor off-site of the water plant up to and along the Indian River Farms <br /> South Relief Canal west to 58th Avenue is the preferred final routing. The advantage of this <br /> route is reduced construction costs, minimized conflicts on the WTP site, and the potential for a <br /> reduced construction duration. Written confirmation from Indian River Farms Water Control <br /> District (IRFWCD) to occupy this right-of-way shall be requested prior to proceeding with final <br /> survey and design . <br /> In conclusion, completion of a West wastewater transmission system described above includes <br /> four proposed sections of piping. The first section is currently under design by another <br /> consulting firm on 82nd Avenue from 4th Street to 8th Street, which connects to an existing 24- <br /> inch force main that extends to the West WWTP . The second is a section of pipe being included <br /> in this project by this Work Order # 12 . This second pipe is along 8th Street from 82 ad Avenue to <br /> 74th Avenue and connects on 82 ad Avenue mentioned previously to the pipe originally associated <br /> with Work Order # 10. The third section of pipe is described in the paragraph above, as <br /> originally associated with Work Order # 10 and is along 8th Street from 74th Ave to 58th Avenue. <br /> The fourth section ofpiphe consists of approximately 3 3/4 miles of force main that connects the <br /> pipe at 8th Street and 58t Avenue with the proposed re-pump station adjacent to LS 489 . This <br /> fourth section of pipe is the replacement of the section of pipe that was originally planned to be <br /> constructed as a result of Work Order #8 . Refer to Exhibit 1 attached depicting the proposed <br /> force main route. <br /> SCOPE OF SERVICES <br /> The Consultant will provide route evaluation, survey, design, permit application preparation, and <br /> construction phase services for the new wastewater transmission system. Potential east-west <br /> corridors for this pipeline include the South Relief Canal, 12tH 8" 4th and Is' Streets SW. The <br /> Consultant will review these alternate routes for the new forcemain to identify those routes with <br /> adequate available right-of-way. The Consultant will provide survey services from the LS #89 <br /> along the IRFDD corridor as listed herein . The survey from 74th Avenue to 82 ad Avenue will be <br /> provided to the Consultant from another firm by IRCU . The consultant shall rely on the <br /> accuracy of this information . The design of the forcemain from LS #89 to the intersection of 8th <br /> Street and 82 ad Avenue will consist of preparation of project drawings and specifications for the <br /> project, which can be advertised for bidding by general contractors . The Consultant will prepare <br /> and submit the appropriate permit applications listed herein for the construction of the project. <br /> The Consultant will provide construction phase services during construction, and provide final <br /> certification of the project. <br /> F:AUtilities\UTILITY - ENGINEER I NGAProjects - Utility Construction PermitsVIRC - Sth Street FM Ext from IR 131v to 58th A <br /> - UCP 2628 Work Order No. 12 to KH &AAA - Work Order No. 12 - March 29, 2006.doe <br /> Page 2 of I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.