Laserfiche WebLink
The Consultant will provide survey of the site and utility information for the construction of the <br /> proposed re-pump station . The Consultant will perform pump selection for this re-pump station <br /> based on the IRCU hydraulic model and information provided by IRCU of the existing and <br /> future wastewater flows collected by this re-pump station. The consultant shall relay on the <br /> accuracy of this information. The Consultant will prepare project drawings and specifications <br /> for the project which can be advertised for bidding by general contractors . The Consultant will <br /> prepare and submit the permit applications listed herein for the construction of the project. The <br /> Consultant will provide construction phase services during construction, observation of startup <br /> and operational testing, and provide final certification of the project. <br /> The Scope of Services for Work Order # 12 consists of the following: <br /> Task 1 — Route Evaluation <br /> The Consultant will evaluate alternate routes for a Western transmission forcemain necessary to <br /> pump wastewater westward. The desired route is from LS #89 re-pump station to the <br /> intersection of 8th Street and 82nd Avenue. The evaluation will be based on right-of-way access <br /> and availability, utility corridor congestion, coordination with existing and proposed utility <br /> infrastructure, and conceptual opinions of construction costs will be considered in the review of <br /> the alignment. Up to three meetings will be attended by the Consultant with the County and <br /> associated authorities along the proposed corridor to determine a suitable route for this pipeline. <br /> The South Relief Canal will be considered as the desired route in this evaluation as a corridor for <br /> installation of the forcemain transmission line. The Consultant will work with staff to identify <br /> the selected route. <br /> The Consultant will prepare sketches of the selected alignment and typical sections for <br /> application to request approval from Indian River Farms Water Control District for IRCU to <br /> install and occupy the District' s right-of-way along the South Relief Canal, 58th Avenue and 8th <br /> Street with this proposed forcemain. Written confirmation of this authorization for IRCU to <br /> occupy this right-of-way shall be requested prior to proceeding with survey and design of that <br /> alignment. If approval from Indian River Farms Water Control District is not obtained, then <br /> additional route evaluation will be required and can be provided as Additional Services . <br /> Task 2 — Survey, Utility Locates, and Soil Borings <br /> Survey limits for this task will be approximately 4 '/4 miles from the LS #89 to the intersection of <br /> 8th Street and 58th Avenue, along the selected route. The fees associated with this task consist of <br /> the survey and underground locates for the alignment that is selected in Task — 1 . Survey <br /> information will only be provided on the side of the roadway or canal within the right-of-way <br /> where the forcemain is planned to be constructed. <br /> Surveys of 8th Street from 58th Avenue to 74th Avenue that were provided under Work Order # 10 <br /> will be used for the design of this section of pipe. The north right-of-way boundary along this <br /> section of the route will be established by the Surveyor. <br /> Survey for the 8d' Street corridor from 74th Ave to 82nd Ave is furnished by others (Schulke, <br /> Bittle & Stoddard LLC) by direction of IRCU. <br /> F:VUtilitiesVUTILITY - ENG INEER INGAProjects - Utility Construction PermitsARC - 8th Street FM Ext from IR Rlv to 58th Av <br /> - UCP 2628 Work Order No. 12 to KIi&AAA - Work Order No. 12 - March 29. 200.6.doe <br /> Page 3 of I I <br />