Laserfiche WebLink
Underground locates of known existing utilities consisting of gas mains, telephone lines, fiber <br /> optics, water, and sewer infrastructure will be provided in limited areas by a Sub consultant <br /> along the selected route that will be surveyed under this task. <br /> Horizontal underground locates will be marked within 100 to 500 feet of intersections, canal <br /> crossings, and areas where surface evidence of known underground utilities exist. These marks <br /> will be shown by the surveyor on the survey. The locating service will provide up to three days <br /> of investigation. <br /> Vertical underground locates of known existing utilities will be required at areas where potential <br /> conflicts exist and at tie-in locations. This information is necessary to collect location, depth, <br /> and pipe size/material that will be required for the design . It is expected that approximately <br /> fifteen (15 ) sites will require this investigation, with approximately two test holes per site for a <br /> total of thirty (30) test holes required for this project. <br /> Horizontal and vertical underground locates in the vicinity of major intersections of the <br /> underground water and wastewater facilities will be provided. The major intersections include <br /> 20th Avenue, 27th Avenue, 43rd Avenue, 58th Avenue, and 81h Street, along the route selected in <br /> Task — 1 . <br /> Soil borings will be provided in areas where horizontal directional drilling (HDD) will occur. <br /> Up to eight soil borings 20 ft depth will be included at different locations where HDD <br /> installation may occur. <br /> Task 3 - Design <br /> Task 3. 1 - Hydraulic Modeling for Sizing Force main and Designing LS #89 Re-Pump <br /> Station <br /> The Consultant will evaluate IRCU' s existing Wastewater Transmission System hydraulic model <br /> to select the forcemain size from the proposed re-pump station to the end of the forcemain route <br /> as well as select pump capacity of the re-pump station. This selection will be based on typical <br /> minimum and maximum velocities of the proposed forcemain while providing forcemain <br /> pressure that does not require that the wastewater to be re-pumped before reaching the West <br /> WWTP or result in pressures that exceed the IRCU Standards. <br /> The Consultant will also evaluate the feasibility of reversing flow from the South W WTP <br /> Forcemain through the South RO Master Repump Station to the West W WTP . The Consultant <br /> will collect information regarding pump stations downstream of LS #89, input this scenario in <br /> the hydraulic model, and evaluate what changes may be required to the pump stations in order to <br /> reverse the wastewater flow. This effort may illustrate that this scenario is only feasible for an <br /> emergency situation. <br /> The Consultant will prepare 'a technical memorandum to IRCU with the results of these <br /> evaluations, and attend up to one meeting to discuss the findings . The Consultant can provide <br /> additional evaluations or meetings related to the hydraulics of this re-pump station, forcemain , or <br /> reversal of flow as Additional Services. <br /> Hydraulic capacity of the transmission forcemain will include additional capacity from a <br /> proposed tie- in at 58th Ave and 8th Street . <br /> F:AUtilitiesVU'CILITY - ENGINEER I NGAProjects - Utility Construction PermitsVIRC - 8th Street FM Ext from IR Bh, to 58th A <br /> - UCP 2628 Work Order No. 12 to KI-I &AAA - Work Order No. 12 - March 29, 2006.doc <br /> Pan 4 of I I <br />