My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-134
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 4:17:12 PM
Creation date
9/30/2015 9:40:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/18/2006
Control Number
2006-134
Agenda Item Number
11.J.2.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
West Wastewater Transmission System- Work Order No. 12
Supplemental fields
SmeadsoftID
5602
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3.2 – Foreemain Design <br /> The Consultant will prepare design drawings of the proposed forcemain piping after the size has <br /> been determined. Existing utility information provided by IRCU and others will be used in <br /> conjunction with the survey and underground locate information as a basis for design of the <br /> piping alignment. Technical specifications will be based on the Owners current Utility <br /> Standards. <br /> Preparation of final construction drawings will consist of plan sheets with survey information, <br /> key sheets, and details. The forcemain design drawings will be plan only view (no profile) with <br /> 1 -inch= 40- feet scale drawings with a two-pane view, with exception of up to six plan and <br /> profile drawings for the locations that cross intersections or canals. Detailed drawings of <br /> specific construction items that may be required for this project will be provided on one sheet. <br /> IRCU Standard detail sheets will consist of up to three sheets. There will be approximately 31 <br /> drawings, which will consist of the following sheets : <br /> • Cover with site location map, one ( 1 ) sheet <br /> • Overall project, one ( 1 ) sheet <br /> • General information, one ( 1 ) sheet <br /> • Horizontal plan views of alignment, eighteen ( 18) sheets <br /> • Plan and profiles for intersections and canal crossings, six (6) sheets <br /> • Specific details, one (1 ) sheet <br /> • IRCU standard details, three (3) sheets <br /> Consultant will attend the following meetings to discuss the objectives and progress of the <br /> project and design requirements specific to this project: <br /> • Kick-off meeting (held concurrently with the re-pump station design Kick-off meeting) <br /> • Progress meeting at 60% completion <br /> • Progress meeting at final completion <br /> The Consultant will submit four (4) full size sets of drawings at 60% completion and final <br /> completion. The revisions to the forcemain design requested by the Owner will be made based <br /> on comments received by the Consultant at the meetings, described above. The Consultant can <br /> provide additional design submittals and attend additional meetings related to forcemain design <br /> as Additional Services . <br /> Task 3 .2 — Re-Pump Station Design <br /> Pump station design will consist of preparation of construction plans and specifications <br /> consisting of the following sheets : <br /> • Cover with site location map, one ( 1) sheet <br /> • Overall project key sheet, one ( 1 ) sheet <br /> • General information, one ( 1 ) sheet <br /> • Horizontal control plan of design drawings, one ( 1 ) sheets <br /> • Plan and profiles of the re-pump station, two (2) sheets <br /> • Mechanical drawings, two (2) sheets <br /> • Structural Plans , Sections and Details, four (4) sheets <br /> F :AUtilitiesVUfIL.ITY - ENGINEERINGAProjects - Utility Construction PermitsVIRC - 8th Street FM Ext from IR BIv to 58th Av <br /> - UCP 2628 Work Order No. 12 to KFI&AAA - Work Order No. 12 - March 29, 2006.doc <br /> Page 5 of I 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.