• Process and Instrumentation drawings, two (2) sheets <br /> • Electrical design drawings, five (5) sheets <br /> • Specific details, one (1 ) sheet <br /> • IRCU standard details, two (2) sheets <br /> The Consultant will provide copies of technical specifications, full size (2406) and half size <br /> ( 11 x17) drawings forbidding and construction. All plans and technical specifications will be <br /> provided to the Owner in electronic format (AutoCADD 2004 / MS Word, respectively) at the <br /> end of the project. The technical specifications and standard details will be based on the Owners <br /> current Utility Standards. <br /> Consultant will employ the services of a sub consultant to perform the electrical design which <br /> will consist of the main electrical service, pump starter and control panel, auxiliary power, <br /> telemetry, lighting, VFD design, control panel with RTUs and preparation of drawings and <br /> specifications for bidding. It is assumed that the new generator will include a pre- fabricated, <br /> sound-attenuated, and weather-rated enclosure. <br /> The design of a wetwell structure will provide increased wastewater storage at this facility. <br /> Two (2) soil borings will be collected for the purpose of reviewing the existing soils <br /> characteristics and conditions adjacent to the existing structure. <br /> SCADA system programming shall be included under the contractor' s scope of work. A <br /> narrative of the control logic will be included in the technical specifications for this purpose. <br /> The design will include odor control similar to the other re-pump stations in Indian River <br /> County. It is anticipated that a Biofilter style system or equal will be specified for this station. If <br /> any other odor control system is required by 1RCU, then that design will be provided as <br /> additional services to this project. <br /> Consultant will attend the following meetings to discuss the objectives and progress of the <br /> project and design requirements specific to this project: <br /> • Kick-off meeting (held concurrently with the forcemain design Kick-off meeting) <br /> • Progress meeting at 60% completion <br /> • Progress meeting at 90% completion <br /> • Progress meeting at final completion <br /> The Consultant will submit four (4) full size sets of drawings at 60% completion, 90% <br /> completion, and final completion. The revisions to the re-pump station design requested by the <br /> Owner will be made based on comments received by the Consultant at the meetings, described <br /> above. The Consultant can provide additional design submittals and attend additional meetings <br /> related to forcemain design as Additional Services. <br /> Task 4 — Permitting <br /> St. John ' s Water Management District (SJRWMD) Environment Resource Permits (ERP) are <br /> required for this construction project, which will have two canal crossings. The purpose of this <br /> ERP application is to provide notice of the proposed construction activities across and along <br /> F:AUtilitiesVUTILITY - ENGINEER I NG\Projects - Utility Construction PermitsVIRC - 8th Street EM Ext from IR niv to 58th Av <br /> - UCP 2628 Work Order No. 12 to KH &AAA - Work Order No. 12 - March 29, 2006.doc <br /> Page 6 of I I <br />