My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-134
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 4:17:12 PM
Creation date
9/30/2015 9:40:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/18/2006
Control Number
2006-134
Agenda Item Number
11.J.2.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
West Wastewater Transmission System- Work Order No. 12
Supplemental fields
SmeadsoftID
5602
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Process and Instrumentation drawings, two (2) sheets <br /> • Electrical design drawings, five (5) sheets <br /> • Specific details, one (1 ) sheet <br /> • IRCU standard details, two (2) sheets <br /> The Consultant will provide copies of technical specifications, full size (2406) and half size <br /> ( 11 x17) drawings forbidding and construction. All plans and technical specifications will be <br /> provided to the Owner in electronic format (AutoCADD 2004 / MS Word, respectively) at the <br /> end of the project. The technical specifications and standard details will be based on the Owners <br /> current Utility Standards. <br /> Consultant will employ the services of a sub consultant to perform the electrical design which <br /> will consist of the main electrical service, pump starter and control panel, auxiliary power, <br /> telemetry, lighting, VFD design, control panel with RTUs and preparation of drawings and <br /> specifications for bidding. It is assumed that the new generator will include a pre- fabricated, <br /> sound-attenuated, and weather-rated enclosure. <br /> The design of a wetwell structure will provide increased wastewater storage at this facility. <br /> Two (2) soil borings will be collected for the purpose of reviewing the existing soils <br /> characteristics and conditions adjacent to the existing structure. <br /> SCADA system programming shall be included under the contractor' s scope of work. A <br /> narrative of the control logic will be included in the technical specifications for this purpose. <br /> The design will include odor control similar to the other re-pump stations in Indian River <br /> County. It is anticipated that a Biofilter style system or equal will be specified for this station. If <br /> any other odor control system is required by 1RCU, then that design will be provided as <br /> additional services to this project. <br /> Consultant will attend the following meetings to discuss the objectives and progress of the <br /> project and design requirements specific to this project: <br /> • Kick-off meeting (held concurrently with the forcemain design Kick-off meeting) <br /> • Progress meeting at 60% completion <br /> • Progress meeting at 90% completion <br /> • Progress meeting at final completion <br /> The Consultant will submit four (4) full size sets of drawings at 60% completion, 90% <br /> completion, and final completion. The revisions to the re-pump station design requested by the <br /> Owner will be made based on comments received by the Consultant at the meetings, described <br /> above. The Consultant can provide additional design submittals and attend additional meetings <br /> related to forcemain design as Additional Services. <br /> Task 4 — Permitting <br /> St. John ' s Water Management District (SJRWMD) Environment Resource Permits (ERP) are <br /> required for this construction project, which will have two canal crossings. The purpose of this <br /> ERP application is to provide notice of the proposed construction activities across and along <br /> F:AUtilitiesVUTILITY - ENGINEER I NG\Projects - Utility Construction PermitsVIRC - 8th Street EM Ext from IR niv to 58th Av <br /> - UCP 2628 Work Order No. 12 to KH &AAA - Work Order No. 12 - March 29, 2006.doc <br /> Page 6 of I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.