drainage canals. The Consultant will respond to one request for additional information (RAI) <br /> from SJRWMD . <br /> If the RAI requires any field investigations, wetland delineations, or additional permits are <br /> required other than those described herein then these permits will be applied for as additional <br /> services to the scope of services. <br /> The Consultant will prepare and submit one FDEP general permit application 62-604 . 3000(8)(x) <br /> for the collection system modifications as an individual permit for construction of this <br /> Wastewater Collection and Transmission System. The permit application fee of $500 will be <br /> included under this scope and paid by the Consultant. The Consultant will submit the permit <br /> application when the drawings and specifications are suitable for submission. The Consultant <br /> will respond to one request for additional information (RAI) from FDEP. <br /> An application and review of this pump station by the Community Development Department <br /> (CDD) is required for these construction activities. This approval is necessary for a Contractor to <br /> apply for a building permit. The Consultant will undertake the task of pursuing a minor site <br /> modification for the pump station building through the CDD on behalf of the Indian River <br /> County Utilities Department. This minor site modification will include stormwater drainage <br /> design and calculations to be submitted to the St. Johns Water Management District in the event <br /> that any stormwater elements are altered and/or the impervious area on the site is increased by <br /> 4,000 ftz or more. <br /> Task 5 — Construction Phase Services <br /> Task 5.1 - Construction Phase Services, Forcemain <br /> The forcemain construction of this project consists of approximately 39,600-LF of pipeline <br /> construction, including but not limited to tie-ins, six (6) horizontal directional drills and/orjack <br /> and bores, valve installation, pressure testing, and site restorations. In order to accelerate the <br /> schedule, the forcemain construction will be divided into two (2) separate projects for bidding. <br /> However, it is assumed that both will be bid at the same time. <br /> The Consultant will provide construction phase services for these projects, consisting of bid <br /> phase assistance and preparation of contract documents, shop drawing review, meeting <br /> attendance, construction field observation , preparation of record drawings based on contractor <br /> red lines (in electronic format in AutoCADD 2004 version in real world coordinates on CD), <br /> mylars, and final certification of completion of the project. <br /> It is anticipated that the duration of the construction phase (notice to proceed to final completion) <br /> will be eight (8) months (35-weeks) and that on-site construction observations will be as <br /> appropriate with the level of construction activity for each project. The two projects are <br /> anticipated to be constructed concurrently. This eight (8) month period of construction is based <br /> on two (2) contractors installing an average of 120-LF of pipe per day, including but not limited <br /> to the open cut sections, trenchless construction sections, restoration, testing, and submittals. <br /> The Consultant will incorporate the Owner ' s contract documents into the plans and <br /> specifications developed in Task — 3 .2 to create the project manual . This will serve as the <br /> Contract between the Owner and the selected contractor for each of the two construction <br /> contracts . The bidding of the forcemain and re-pump station construction projects shall be <br /> F :AUtilities\UTILITY - ENG INEERINGAProjects - Utihty Construction PermltsVIRC - 8th Street FM Ext from IR 61v to 58th Av <br /> - UCP 2628 Work Order No. 12 to KI&AAA - Work Order No. 12 - March 2912006.doe <br /> Page 7 of 1 I <br />