My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-134
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-134
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 4:17:12 PM
Creation date
9/30/2015 9:40:00 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/18/2006
Control Number
2006-134
Agenda Item Number
11.J.2.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
West Wastewater Transmission System- Work Order No. 12
Supplemental fields
SmeadsoftID
5602
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concurrent. Any revisions to the Owner' s contract documents during the construction phase can <br /> be provided by the Consultant, as Additional Services . <br /> During the bidding phase, the Consultant will respond to contractor questions and prepare a <br /> reasonable number of addendums, if required, which will be distributed to all the contract <br /> document holders . The Consultant will attend one ( 1 ) pre-bid meeting at the project site or <br /> Client ' s office. The Consultant will sell project manuals from Consultant ' s office, consisting of <br /> drawings, specifications, and all addendums. Bidders will pay the Consultant directly for the bid <br /> documents. <br /> Shop drawing submittals will be reviewed for conformance with the intent of the contract <br /> documents . Shop drawings will be submitted directly to the Consultant. The Consultant will <br /> review the submittals and return copies to the contractor and Indian River County Utilities . <br /> The Consultant will coordinate and attend one- ( 1 ) project status meetings per month for <br /> coordination and status updates of the project with the Contractor and Owner. The Consultant <br /> will provide observation of construction for the anticipated duration of the project described <br /> herein. The Consultant will also review pay requests and provide recommendations for payment <br /> to Indian River County Utilities for the progress of the work. <br /> Construction observation will be provided by a field inspector. Total observation time is <br /> anticipated to be approximately 420-hours . This is based on 12-hours per week of field <br /> observations plus 8 -hours of field observations for each of the six (6) horizontal directional <br /> drills. These hours are based on the two projects being constructed concurrently. The <br /> Consultant's visits will be for the purpose of endeavoring to provide the Client a greater degree <br /> of confidence that the completed work of its contractors will generally conform to the <br /> construction documents prepared by the Consultant. The Consultant neither guarantees the <br /> performance of contractors, nor assumes responsibility for any contractor' s failure to perform its <br /> work in accordance with the contract documents . This will consist of witnessing installation of <br /> piping, pressure testing of new piping, and flushing. Work that the Consultant believes does not <br /> comply with the contract documents will be brought to the attention of Indian River County <br /> Utilities and the contractor. The Consultant shall have no responsibility for any contractor's <br /> means, methods, techniques, equipment choice and usage, sequence, schedule, safety programs, <br /> or safety practices. <br /> A punch-list will be prepared for the items that need to be completed for final closeout of the <br /> project. The Consultant will perform two site visits with the contractor to review the status of <br /> the completion of these punch-list items . <br /> The Consultant will prepare record drawings of the forcemain using information provided by the <br /> contractor. A set of Mylar reproducible drawings, an electronic copy in AutoCAD format on a <br /> CD-ROM, and two sets of prints will be delivered to Indian River County Utilities upon <br /> completion of this project. <br /> A request for final release of the modifications will be submitted to FDEP, consisting of a <br /> certification application and record drawings. <br /> Task 5.2 - Construction Phase Services, Re-Pump Station <br /> F:AUtilities\UTILITY - ENGINEER I NGAProjects - Utility Construction Permits\IRC - 8th Street FM Ext from IR my to 58th Av <br /> - UCP 2628 Work Order No. 12 to KH&A\A - Work Order No. 12 - March 29, 2006.doc <br /> Page 8 of I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.