Laserfiche WebLink
The Consultant will provide professional services for Task 5 and 6 on a cost plus fee basis as follows : <br /> Task No. Task Task Fee <br /> Task 5 Industrial Wastewater Contributions $ 15,000 <br /> Task 6 Responses to Requests for Additional $ 10,000 <br /> Information <br /> Total Cost Plus Fee <br /> Additional Services : <br /> The following services are not included in the Scope of Services for this project, but may be required <br /> depending on circumstances that may arise during the execution of this project. Other items that may be <br /> considered additional services are mentioned herein. Additional services include, but may not be limited <br /> to the following: <br /> • Field surveying is not included in the scope described herein. <br /> • Design drawings of any addition to the facility as requested by FDEP. <br /> • Reuse feasibility and agricultural use permitting is not included. <br /> • EPA/NPDES Notice of Intent for Stormwater Notification for the wastewater treatment facility. <br /> E:ASouth IRCU WWTP Operating Permit Renewal Scope revl .doc <br /> Page 5 of 5 <br />