My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-310
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2018 3:00:59 PM
Creation date
9/30/2015 11:17:40 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$ VRr 1 <br /> 17 <br /> a,�nM <br /> Board of County Commissioners <br /> Administration <br /> Building A (South) <br /> 1801 27th Street <br /> Vero Beach, Florida 32960 <br /> Telephone: (772) 567-8000 FAX: 772-778-9391 <br /> WORK ORDER NO . 13 ( Engineering/Survey) <br /> FOR <br /> PROFESSIONAL SURVEYING SERVICES AGREEMENT <br /> FOR ANNUAL SURVEYING AND MAPPING SERVICES <br /> 2006 —2007 CONTRACT 0390 <br /> WITH <br /> Masteller, Moler, Reed & Taylor, Inc. <br /> In accordance with Contract No . 0390 2005-2006 <br /> Project : <br /> Right-of-Way Mapping Project <br /> Indian River Drive, Sebastian Florida <br /> Phase Two <br /> IRC Project 0634 <br /> This Work Order No . 13 is in accordance with the existing AGREEMENT dated September 19th , <br /> 2006 between Masteller, Moler, Reed & Taylor, Inc. (SURVEYOR) and Indian River County <br /> (COUNTY). This Work Order No . 13 amends the agreement as follows: <br /> SECTION I — PROJECT LIMITS <br /> This Work Order No . 13 is for the SURVEYOR to prepare a Right of Way Map for Phase Two of <br /> the existing 66 foot wide Right of Way for Indian River Drive from a Right of Way Survey <br /> performed as a part of Phase One of the project. The overall project limits range from the <br /> southern intersection of Indian River Drive with US 1 to the northern intersection of Indian River <br /> Drive with US 1 (approx. 3. 5 miles) . Phase Two of the project ranges from the southern overall <br /> project limits at US1 to the northern city limits of the City of Sebastian (approx . 2 . 0 miles ). All <br /> lying in Indian River County, Florida . <br /> SECTION II - SCOPE OF SERVICES <br /> As agreed upon between SURVEYOR and COUNTY, the SURVEYOR shall provide <br /> Professional Land Surveying services to complete all tasks as outlined in this Work Order No. <br /> 13 described as follows : <br /> • Right of Way Survey (Performed as a part of Phase One) : <br /> 1 . Establish and field locate the centerline of the existing 66 foot Right of Way for Indian <br /> River Drive from US1 to US1 as described in Deed Book 538, Page 541 . <br /> 2 . Find or establish sectional data as necessary for establishing the Indian River Drive <br /> centerline and certify as required . Locate and identify existing Right of Way <br /> monumentation along the overall project limits . Prepare and record Certified Corner <br /> Reports as applicable to Florida Statutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.