Laserfiche WebLink
raC Work Order # 13 <br /> I.R. Drive R/W Map Phase Two <br /> September 11 , 2007 <br /> Page 2 of 6 <br /> 3 . Monument Permanent Control Points (PCP's) with referenced points along the <br /> centerline at all changes in direction , including all Points of Curvature and Tangency. <br /> Provide State Plane Coordinate values on all baseline control points and reference <br /> points. PCP's and reference points shall be a nail and tab stamped "PCP LB #4644" <br /> and shall be placed at a maximum of 1000 feet apart. <br /> 4 . The product shall include underlying topographic information from prior work <br /> performed by Masteller, Moler, Reed & Taylor, Inc. and Indian River County. <br /> 5 . Locate and depict all Indian River County G . P. S . control monuments. <br /> • Right of Way Mapping: <br /> 1 . Prepare final Right of Way Map for Phase Two as described above and performed <br /> as a part of Phase One. Map shall depict limits of 66 foot Right of Way for Phase <br /> Two and the centerline of right of way for overall project limits including ties to <br /> sectional data as necessary. <br /> 2 . Perform research for deeds , right of way maps , etc. as necessary. <br /> 3 . Map shall also depict limits of existing Rights-of-Ways and/or Boundaries as per <br /> apparent physical evidence, deeds as provided by the County and the limits of Right <br /> of Way as shown on existing recorded plats along the route. <br /> 4. Right of Way Map shall meet or exceed all requirements as listed in the Indian River <br /> County Right of Way checklist as modified and attached hereto as Exhibit "A" . <br /> SECTION III — COUNTY RESPONSIBILITIES <br /> It is the COUNTY's responsibility to provide an abbreviated title search and all other information <br /> of record for properties along the proposed route for Phase Two . <br /> SECTION IV — CONSULTANTS RESPONSIBILITIES <br /> It is the Consultants responsibility to obtain legal access to properties along the route prior to <br /> performing any work. Proper safety precautions and protocol shall be maintained at all times . <br /> SECTION V — TIME FOR COMPLETION <br /> Project shall be completed within ninety (90) calendar days from Notice to Proceed . Schedule <br /> shall include a 60-70% submittal within sixty (60) calendar days for review and approvals by the <br /> COUNTY. Final submittal ( Deliverables) shall be provided to the COUNTY upon completion . <br /> F:\Engineering\Capital Projects\0390-Annual Survey Contracts\Masteller Moler and Reed\2006-2007\IR Drive ROW Map\Phase 2, 9- 15-07\0390 <br /> IR Drive Ph 2 ROW Map Work Order # 13 9-18-07.doc <br />